Normal heating
The table below contains the normal condition of the 4-way valve in heating mode.
The valve does not
shift from cooling to
heating
The table below contains the possible checks for finding the cause for the valve not shifting from
cooling to heating and the corresponding procedure to solve the problem.
Discharge
tube 1
Suction
tube 2
Tube to the
plate heat
exchanger
Tube to the
air-cooled
heat
exchanger
Left pilot
back capil-
lary tube
Right pilot
back capil-
lary tube
Hot
Cool
Hot as in
column 1
Cool as in
column 2
Temperature
of valve body
Temperature
of valve body
Check
Cause
Procedure
Check the electrical circuit.
No voltage to the coil
Repair the electrical circuit.
Check the coil.
Coil is defective.
Replace the coil.
Check the refrigerant charge.
Charge is low.
1. Repair the refrigerant charge.
2. Recharge the system.
Pressure differential is
too high.
Re-check the system.
Check the operation conditions in the following table to find the cause of the malfunction.
The procedure for solving the problem is described in the last column.
See the illustration to situate the numbers in the table heading.
Содержание EUWAB10KBZW1
Страница 2: ......
Страница 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Страница 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Страница 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Страница 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Страница 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Страница 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Страница 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Страница 210: ...ESIE11 02 4 Index 3 1 4 5...