ESIE98–06A
Wiring Layout
Part 1 – System Outline
1–42
Wiring diagram
EUWY25-30HC
connector for power supply controller
defrost protector circuit 1,circuit 2, circuit3
connector for digital output
capacitors for fanmotors
evaporating temperature thermostat circuit1, circuit2, circuit3
switch for dual setpoint
sensor for air temperature measurement
sensor for coil temperature measurement
auxiliary relay for fanspeed control
interconnection connector switchbox 1,switchbox 3
switch for cool/heat selection (open=cooling)
thermal protector fan 5, 6
thermal protector fan 3, 4
fan motors for compressor3
fan motors for compressor2
cool/heat contactor
connector for analog input
connector for digital input
compressor contactor circuit1,circuit2,circuit3
indication lamp alarm
automatic fuse for secondary of TR1
main fuses for the unit
auxiliary relay for fanspeed control
indication lamp cooling / heating
automatic fuse for the primary of TR1 + control circuit
interconnection connector switchbox 1,switchbox 2
reverse valve circuit1, circuit2, circuit3
transfo 230V -> 24V for supply of controllers
main isolator switch
contact that closes if pump is working
flowswitch
switch for remote start/stop
high pressure switch for circuit1, circuit2, circuit3
sensor for ambient temperature measurement
outlet water temperature sensor
sensor for evaporator/condensor inlet water t%%d measurement
reverse phase protector
thermal protector fan 1, 2
discharge thermal protector circuit1, circuit2, circuit3
main earth terminal
compressor motors for compressor1, compressor2, compressor3
fan motors for compressor1
pumpcontactor
contactor for defrost circuit1, circuit2, circuit3
contactor for fanmotor circuit1, circuit2, circuit3
auxiliary relay for safety circuit1, circuit2, circuit3
overcurrent relay circuit1, circuit2 ,circuit3
indication lamp operation circuit1,circuit2,circuit3
indication lamp general operation
automaticfuse for the fans circuit
automatic fuse for the secondary of TR1
crankcase heater circuit1,circuit2,circuit3
J17
S13DF,S14DF,S15DF #
J24,J22,J5,J6
C1,C2,C3,C4,C5,C6
S16T,S17T,S18T
S8S *
R12T,R22T,R32T
R11T,R21T,R31T
K14A,K15A
X3A/X4A,X3B/X4B
S7S *
Q31F,Q32F
Q21F,Q22F
M31F,M32F
M21F,M22F
K5A, K9A
J1,J2
J3,J4,J21
K1M,K2M,K3M
H1P *
F9B
F1U,F2U,F3U#
K12A,K13A
H6P *
F5B
X1A/X1B,X2A/X2B
YRV1,YRV2,YRV3
TR1
S12S #
S11L #
S10L #
S9S *
S1HP,S2HP,S3HP
R3T
R4T,R5T,R6T
R7T
R1P
Q11F,Q12F
Q1D,Q2D,Q3D
PE
M1C,M2C,M3C
M11F,M12F
KP *
K6A,K7A,K8A
K1F,K2F,K3F
K1A,K2A,K3A
K4S,K5S,K6S
H3P,H4P,H5P*
H2P *
F7B
F6B
E1H,E2H,E3H
Содержание EUWA/Y5-30HB/C(Z)
Страница 2: ......
Страница 8: ...Introduction ESIE98 06A vi 3 1 4 5...
Страница 10: ...ESIE98 06A 1 2 Part 1 System Outline 3 1 1 4 5...
Страница 28: ...General Outline ESIE98 06A 1 20 Part 1 System Outline 3 1 1 4 5...
Страница 36: ...Piping Layout ESIE98 06A 1 28 Part 1 System Outline 3 1 1 4 5...
Страница 52: ...ESIE98 06A Wiring Layout Part 1 System Outline 1 44...
Страница 58: ...ESIE98 06A 2 2 Part 2 Functional Description 3 1 2 4 5...
Страница 80: ...The Controller for the EUWA Y5 10HB Z Chillers ESIE98 06A 2 24 Part 2 Functional Description 3 1 2 4 5...
Страница 98: ...The Controller for the EUWA Y15 30HC Z Chillers ESIE98 06A 2 42 Part 2 Functional Description 3 1 2 4 5...
Страница 100: ...ESIE98 06A 3 2 Part 3 Troubleshooting 3 1 3 4 5...
Страница 134: ...Troubleshooting ESIE98 06A 3 36 Part 3 Troubleshooting 3 1 3 4 5...
Страница 136: ...ESIE98 06A 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 142: ...Pre Test Run Checks ESIE98 06A 4 8 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 146: ...ESIE98 06A 5 2 Part 5 Maintenance 3 1 5 4...