6-14 Monitoring Operation Status of HRVs
■
■
■
■
Procedure for monitoring HRV operation
The operation of all the HRVs can be monitored by zone or by
group.
[Procedure]
1.
To view information on a zone, select the “Monitoring (Zone
list)” item from the zone tree area (1). To view information on
a group, select the zone including the group from the zone
tree area. Then select the target zone or group in the main
display area (2).
2.
Press the “
” button. Screen 2 Operation
appears.
[When Monitoring a Zone of HRVs]
When selecting a zone including HRVs, the Zone setup
screen (Screen 2) appears.
(3) Click the “
” button to display the HRV set-
ting screen (Screen 3).
You can view the following two items.
(4) Ventilation mode
Displays the current Ventilation mode.
(5) Ventilation amount
Displays the current Ventilation amount.
Upon completion, click the “
” (6) button to return to
the Main screen.
[When Monitoring a Group of HRVs]
When selecting an HRV group, the Group setup screen
(Screen 4) appears. You can view the following items in this
screen.
(7) Current Condition
• Start/Stop state
• Ventilation mode
• Ventilation amount
• Filter sign
(8) R/C Mode (Start/Stop)
Displays the setting for permitting/prohibiting start/stop
operations through remote controllers.
Upon completion, click the “
” button on each screens
to return to the Main screen.
CAUTION
• This screen can be used for both setting and monitoring.
When using it only for monitoring, be sure to click the
“
” button, rather than the “
” to close it.
This prevents you from inadvertently changing existing
settings.
(1)
(2)
Screen 1: Main screen
(3)
Screen 2: Zone setup screen
Screen 3: HRV setting screen
(4)
(5)
(6)
Screen 4: Group setup screen
(7)
(8)