Installation
www.DaikinApplied.com
5
IM 1240-4 • INTELLIGENT EQUIPMENT
Installation
Unpacking
Material shipped loose
Factory Installed Intelligent Equipment
If the Intelligent Equipment solution was ordered with the chiller,
rooftop, or air handling unit, it shipped with the M2M, EMM,
CT’s, Powers Supply and Fuse Block already installed in the
control enclosure, and associated interconnections already
made. On chillers, the antenna bases are shipped inside the
control enclosure, along with the antenna flags and Ethernet
adapter. The coaxial cable for the antenna bases must be routed
to the control enclosure once the antenna base is installed in
the field. If needed, the Ethernet adapter is field-installed. For
rooftop units, the antenna bases are pre-installed, antenna flags
and Ethernet adapter ship inside the schematics envelope for
the unit. The antenna(s) and Ethernet adapter are field-installed.
Retrofit Intelligent Equipment on Chillers
When the Intelligent Equipment solution is ordered for retrofit
installation, the following components will ship as a kit:
• M2M Gateway
• Power Supply
• EMM (Not on Gateway-on-the-Go or IE Express kits)
• Fuse Block (with 5A Fuses pre-installed) (Not on
Gateway-on-the-Go or IE Express kits)
•
Antenna flag and base
• Three Current Transformers (CT’s) (Not on Gateway-on-
the-Go or IE Express kits)
• 3' USB cable (Not on Gateway-on-the-Go or IE Express
kits)
• 6' Ethernet Patch cable
• USB-to-Ethernet Adapter
• 6" EMM Wiring Harness (Not on Gateway-on-the-Go or
IE Express kits)
• 6' EMM Wiring Harness (Not on Gateway-on-the-Go or IE
Express kits)
• Hardware packet, including (1) patch plate with two
watertight grommets pre-installed, (1) 0.875" grommet,
(2) grounding harnesses, (1) 3-wire voltage harness,
wire ties, wire tie hangers, (12) self-tapping sheet metal
screws, (1) section of 600V-rated heat shrink tubing.
Upon receiving, verify that all components are present, and
notify the supplier of any shortage.
Retrofit Intelligent Equipment on Rooftop, or
Air Handling Unit
When the Intelligent Equipment solution is ordered for retrofit
installation on a rooftop or air handling unit, the following
components will ship loose:
• Two Mounting brackets. One bracket contains the M2M
Gateway and power supply, the other contains the EMM
and fuse block (with 5A Fuses pre-installed) (EMM and
Fuse block not included for Gateway-on-the-Go or IE
Express kits)
•
Antenna flags and bases
• Three Current Transformers (CT’s) (Not on Gateway-on-
the-Go or IE Express kits)
• 3' USB cable (Not on Gateway-on-the-Go or IE Express
kits)
• 6' Ethernet Patch cable
• USB-to-Ethernet Adapter
• 6" EMM Wiring Harness (Not on Gateway-on-the-Go or
IE Express kits)
• 6' EMM Wiring Harness (Not on Gateway-on-the-Go or IE
Express kits)
• Hardware packet, including (1) patch plate with two
watertight grommets pre-installed
• (2) 5/8" bushings
• (1) grounding harness
• (1) 3-wire voltage harness, wire ties, wire tie hangers
• (12) self-tapping sheet metal screws
• (1) section of 600V-rated heat shrink tubing.
Upon receiving, verify that all components are present, and
notify the supplier of any shortage.
Necessary Tools
• Corded (or powerful cordless) Drill
• 7/8" Step Drill Bit (suitable for drilling through metal
enclosure)
• 1/4" Drill Bit for wire tie hangers (suitable for drilling
through metal enclosure)
• 3/32" Drill Bit for pilot holes (suitable for drilling through
metal enclosure)
• Multimeter
• Wire strippers
• SAE hex wrench set
• Precision screwdriver set
• #2 Phillips screwdriver
• #2 Flat screwdriver
• 5/16" Nut driver
• Hammer
• Pliers
•
Small carpenter square (8" × 12")
• Level
• Clear silicone sealant