background image

IM 1240-4 • INTELLIGENT EQUIPMENT 4 

www.DaikinApplied.com

Introduction

Components

 CAUTION

Extreme temperature hazard. Can cause damage to system 

components. 

The Intelligent Equipment hardware is designed to operate 

in ambient temperatures from -22 to 158 degrees F (-30 to 70 degrees C) 

and in relative humidity up to 90% (non-condensing). 

Machine-to-Machine (M2M) Gateway

The M2M Gateway is a factory tested and commissioned 

device, which analyzes and delivers data to the cloud via 

wireless (Wi-Fi, cellular) or local area network (LAN) connection. 

The M2M Gateway implements security, including data delivery 

via secure HTTPS using SSL, and whitelisting protection. In 

the case of a unit ordered with Intelligent Equipment, the M2M 

gateway will be factory-installed in the unit control panel. For 

installation in retrofit applications, see document section titled, 

Chiller Installation Instructions on page 7

.

Antenna

The provided Cellular/Wi-Fi antenna must be field-mounted, 

regardless of whether the Daikin Applied Intelligent Equipment 

solution was ordered factory-installed or for retrofit installation. 

In most cases, only one of the two antennas will be installed 

and connected to the M2M Gateway. The antenna has a 

magnetic base, which is suitable for directly mounting to the 

unit control panel or case.

Energy Management Module (EMM)

(Not on Gateway-on-the-Go, IE Express, or 

WMC kits)

The EMM is a factory tested and commissioned device, which 

monitors unit voltage, current, and power and transmits this 

data to the M2M Gateway for delivery to the cloud. In the case 

of a unit ordered with Intelligent Equipment, the EMM will be 

factory-installed in the unit control panel. For installation in 

retrofit applications, see document section titled, 

Installing 

Energy Management Module on page 9

.

Current Transformers (CT’s)

(Not on Gateway-on-the-Go, IE Express, or 

WMC kits)

Three Current Transformers (CT’s) are supplied with the 

Intelligent Equipment solution. At the time of order, the 

Maximum Current Ampacity (MCA) for the unit is specified, 

thereby driving selection of appropriately-sized CT’s (See 

Table 

1

 for CT sizing and specifications). In the case of a unit ordered 

with Intelligent Equipment, the CT’s will be factory-installed 

within the unit control panel. For installation of the CT’s in 

retrofit applications, see document section titled, 

Installing 

Spilt-Core CT’s on page 15 

and 

Installing Rogowski Coil 

CT’s on page 16

Power Supply

A 24 VDC Power Supply is provided to power the M2M 

Gateway. In the case of a unit ordered with Intelligent 

Equipment, the power supply will be factory-installed in the 

unit control panel. For installation of the power supply  in 

retrofit applications, see document section titled, 

Installing 

Power Supply on page 9

.

Fuse Block

(Not on Gateway-on-the-Go, IE Express, or 

WMC kits)

A Fuse Block is provided to provide over-current protection for 

the Energy Management Module (EMM). Replaceable 5Amp 

fuses are pre-installed in the Fuse Block. In the case of a unit 

ordered with Intelligent Equipment, the Fuse Block will be 

factory-installed in the unit control panel. For installation of the 

Fuse Block in retrofit applications, see document section titled, 

Installing Fuse Block on page 10

.

USB-to-Ethernet Adapter

For installations where a Local Area Network (LAN) connection 

is to be used, a USB-to-Ethernet adapter is included in all 

shipments. The adapter is necessary because the M2M 

Gateway has a single Ethernet plug, which is connected to 

the MicroTech III controller, and, therefore, unavailable for 

connection to the LAN.

Table 1: 

CT Sizing and Specifications

Key 

Specifications

50A Model

100A Model

200A Model

600A Model

1000A Model

Rogowski  

Coil Model

Window Size

0.4ʺ (10 mm)

1ʺ (25 mm)

1ʺ (25 mm)

1.25ʺ (31.8 mm)

2ʺ (50.8 mm)

5"

Current Range

0.25 – 80A AC

1 - 200A AC

1 – 300A AC

12 – 780A AC

20 – 1300A AC

10 – 1300A AC

Output

333 mV  

at rated current

333 mV  

at rated current

333 mV  

at rated current

333 mV  

at rated current

333 mV  

at rated current

333 mV  

at rated current

Ratio Error

<0.5% from 0.25 –  

80A AC (typical)

<0.3% from 1 –  

200A AC (typical)

<1.0% from 1 –  

300A AC (typical)

<1% from 12 –  

780A AC (typical)

<1% from 20 –  

1300A AC (typical)

<1% from 10 –  

1300A AC (typical)

Phase Error

<1.5° from 1 – 80A AC
<2° from 0.25 – 1A AC

<0.5° from 1 –  

200A AC

<0.5° from 1 –  

300A AC 

<2° from 12 –  

780A AC

<2° from 20 –  

1300A AC

<2° from 10 –  

1300A AC

Содержание AGZ-D

Страница 1: ...des IM 1219 Intelligent Equipment for Daikin Pathfinder and Trailblazer Air cooled Chillers Magnitude Magnetic Bearing Chillers Rebel and Maverick II Commercial Packaged Rooftops RoofPak Applied Packa...

Страница 2: ...MTIII 12 M2M Connection to WMC 12 M2M Connection to EMM 12 Connection of Power Supply 13 Connection of EMM to Split Core CT s 14 Connection of EMM to Rogowski Coil CT s 14 Connection of Rogowski Coil...

Страница 3: ...ponents consist of one Machine to Machine M2M Gateway one Energy Management Module EMM Antenna and three Current Transformers CT s Hazardous Information Messages Recognize Safety Symbols Words and Lab...

Страница 4: ...on of appropriately sized CT s See Table 1 for CT sizing and specifications In the case of a unit ordered with Intelligent Equipment the CT s will be factory installed within the unit control panel Fo...

Страница 5: ...grommet 2 grounding harnesses 1 3 wire voltage harness wire ties wire tie hangers 12 self tapping sheet metal screws 1 section of 600V rated heat shrink tubing Upon receiving verify that all component...

Страница 6: ...controlled CAUTION Static sensitive components Can cause equipment damage Discharge any static electrical charge by touching the bare metal inside the control panel before performing any service work...

Страница 7: ...On AWS models locate IE Hardware as space allows within control enclosure Figure 6 and Figure 7 provide the typical layout of AWS small and large enclosures On WMC chillers only the M2M gateway and ga...

Страница 8: ...PMENT 8 www DaikinApplied com Installation Figure 3 Component Locations AGZ D Large Panel Figure 4 Component Locations AGZ E Large Panel Figure 5 Component Locations AWV Large Panel Figure 6 Component...

Страница 9: ...just created using a 7 64 drill bit Finally attach the EMM to the backplane using 4 of the provided 6 sheet metal screws 5 16 head Installing Power Supply Prior to installing any Intelligent Equipmen...

Страница 10: ...arks just created using a 1 8 drill bit Finally attach the fuse block to the backplane using 2 of the provided 8 sheet metal screws 5 16 head Fuses can be reinstalled but the covers should remain off...

Страница 11: ...NT Figure 13 AGZ Large Enclosure Knockout Location Rear of Enclosure Figure 14 AWV Large Enclosure Knockout Location Rear of Enclosure Figure 15 AWS Small Enclosure Knockout Location Rear of Enclosure...

Страница 12: ...e a minimum of 5 inches of clearance between all cables and conductors with 300V rated insulation or less and areas of the control enclosure containing higher voltage components and conductors NOTICE...

Страница 13: ...icroTech III AGZ D or AGZ E unit connect the Line brown conductor to terminal TB1 11B and the Neutral blue conductor to terminal TB1 32B Figure 21 On a MicroTech III AWV or AWS unit connect the Line b...

Страница 14: ...ered terminal Figure 25 Figure 24 Hinged Cover Screw Locations Figure 25 Connection of EMM to CT s Connection of EMM to Rogowski Coil CT s Not on Gateway on the Go IE Express or WMC kits Chillers with...

Страница 15: ...should be connected to terminal TB2 42 or TB2 43 and terminal GND Vin on the power supply should be connected to terminal TB2 81 TB2 83 or TB2 84 Figure 29 On an AWV chiller terminal Vin on the power...

Страница 16: ...ted to EMM terminal CT_B on phase L2 and the Rogowski Coil CT connected to EMM terminal CT_C on phase L3 Figure 32 Ensure that the Load indicator on the CT is oriented correctly The molded arrow on th...

Страница 17: ...connect the VinA Tan VinB Orange and VinC Violet terminals on the EMM to the Load terminals on the Fuse Block Figure 33 If needed remove the plastic protective shield from Power Distribution Block 1 P...

Страница 18: ...minal on the EMM itself Figure 35 Connect the free ring terminals for both the M2M and EMM to the nearest available grounding lug in the control enclosure Figure 36 Once all connections are made to th...

Страница 19: ...d CAUTION Static sensitive components Can cause equipment damage Discharge any static electrical charge by touching the bare metal inside the control panel before performing any service work Never unp...

Страница 20: ...Figure 39 Figure 39 3G and WLAN Connections LAN Installation If Applicable LAN Connection If using the local area network LAN for cloud connectivity a USB to Ethernet Adapter must be used for connecti...

Страница 21: ...2M bracket is designed for installation on the inside of the lower left internal enclosure door Figure 42 and the EMM bracket is designed for installation on the inside of the lower right internal enc...

Страница 22: ...eable in the operation of the equipment being controlled WARNING Care must be taken to ensure a minimum of 5 inches of clearance between all cables and conductors with 300V rated insulation or less an...

Страница 23: ...and areas of the control enclosure containing higher voltage components and conductors In RoofPak installations all non 600V rated wires Ethernet Coax USB must be wrapped in the 600V rated insulation...

Страница 24: ...smaller diameter hole should be present on the inside of the enclosure Again using the step drill bit drill this hole on the inside of the enclosure to a 5 8 diameter Drill no deeper than necessary t...

Страница 25: ...ause equipment damage Discharge any static electrical charge by touching the bare metal inside the control panel before performing any service work Never unplug cables circuit board terminal blocks or...

Страница 26: ...58 On a MicroTech III Maverick II unit connect the Line brown conductor to terminal TB1A 1 2 3 or 4 and the Neutral blue conductor to terminal TB1A 5 6 7 8 or 9 Figure 59 On a MicroTech III RPS RPR RD...

Страница 27: ...e must go to terminal labeled CT and the black wire must go to the associated lettered terminal Figure 62 Figure 61 Hinged Cover Screw Locations Figure 62 Connection of EMM to CT s Installing CT s Not...

Страница 28: ...gure 66 Once all connections are made to the line voltage side of the EMM close the hinged cover and reinstall the screws Figure 67 depicts an EMM with all high voltage terminations made and the hinge...

Страница 29: ...nel knowledgeable in the operation of the equipment being controlled CAUTION Static sensitive components Can cause equipment damage Discharge any static electrical charge by touching the bare metal in...

Страница 30: ...Figure 69 Figure 69 3G and WLAN Connections LAN Installation If Applicable LAN Connection If using the local area network LAN for cloud connectivity a USB to Ethernet Adapter must be used for connect...

Страница 31: ...ateway defect Simply click the advanced menu link within the browser then accept the security exception a When prompted enter the User Name service b Enter the unique password that was provided with t...

Страница 32: ...the M2M Gateway 14 Reconnect the Ethernet cable between the M2M Gateway and the MicroTech III controller NOTE Be certain that the IT staff has allowed incoming and outgoing Internet traffic on TCP po...

Страница 33: ...Installation www DaikinApplied com 33 IM 1240 4 INTELLIGENT EQUIPMENT Figure 73 Wireless Configuration Screen Figure 74 Wireless Signal Strength...

Страница 34: ...croTech III controller to make use of the ETH port on the M2M Gateway 3 Navigate to your laptop s Local Area Connection settings screen and change the IP subnet mask to 255 255 0 0 and set the IP addr...

Страница 35: ...r in parentheses next to Review Changes If so proceed to step 15 if not repeat steps 8 14 18 Click the Apply Changes button in the lower right hand corner of the screen The page will automatically ref...

Страница 36: ...IM 1240 4 INTELLIGENT EQUIPMENT 36 www DaikinApplied com Installation Figure 76 WAN Configuration Settings Figure 77 Add New Interface Selection...

Страница 37: ...ag which opens the unit details screen Figure 82 Click the Commissioning Procedure button You will then receive a message indicating that you have 30 days to complete the commissioning procedure Figur...

Страница 38: ...IM 1240 4 INTELLIGENT EQUIPMENT 38 www DaikinApplied com Installation Figure 83 Thirty Day Message Figure 84 Commissioning Procedures Screen...

Страница 39: ...E Your browser will likely notify you of a security risk related to an unsigned security certificate This is expected and does not indicate a gateway defect Simply click the advanced menu link within...

Страница 40: ...IM 1240 4 INTELLIGENT EQUIPMENT 40 www DaikinApplied com Troubleshooting Figure 85 M2M Gateway Home Page Figure 86 Verify Cellular Signal Strength...

Страница 41: ...Under Time Zone verify that the indicated Time Zone is accurate If so continue to step 5 6 If the Time Zone is inaccurate use the list to select the correct Time Zone then click Save Changes a After...

Страница 42: ...IM 1240 4 INTELLIGENT EQUIPMENT 42 www DaikinApplied com Troubleshooting Figure 87 System Tab Figure 88 Time Updated to Time Zone Figure 89 Keypad Controls Figure 90 Date Time Schedules Menu...

Страница 43: ...cation Wi Fi connection cannot be established Check antenna connection to magnetic base Check antenna connection to WLAN connection on Gateway Check signal strength through WebIF Verify Wi Fi IP addre...

Страница 44: ...following information as necessary prior to a technician going to the jobsite and commissioning the gateway A CAT 5E Ethernet communication cable with an extra feet of coiled cable and a RJ45 connect...

Страница 45: ......

Страница 46: ...nt to its standard terms and conditions of sale including Limited Product Warranty Consult your local Daikin Applied Representative for warranty details To find your local Daikin Applied Representativ...

Отзывы: