Instruction
SiBE12-519
86
System Configuration
2.4
Preparation before
Operation
Preparation Before Operation
■
To set the batteries
1. Press
with a finger and slide the
front cover to take it off.
2. Set two dry batteries (AAA).
3. Set the front cover as before.
ATTENTION
■
■
■
■
About batteries
• When replacing the batteries, use batteries of the same type, and replace the two old batteries
together.
• When the system is not used for a long time, take the batteries out.
• We recommend replacing once a year, although if the remote controller display begins to fade or if
reception deteriorates, please replace with new alkali batteries. Using manganese batteries reduces
the lifespan.
• The attached batteries are provided for the initial use of the system.
The usable period of the batteries may be short depending on the manufactured date of the air
conditioner.
+
–
–
+
2
3
1
Position + and
– correctly!
Содержание 2MKS40DVMB
Страница 10: ...SiBE12 519 List of Functions 1 Part 1 List of Functions 1 Cooling Only 2 2 Heat Pump 4 ...
Страница 15: ...Heat Pump SiBE12 519 6 List of Functions ...
Страница 29: ...Heat Pump SiBE12 519 20 Specifications ...
Страница 89: ...Instruction SiBE12 519 80 System Configuration FDK X S25 35C Names of parts Indoor Unit 3 6 8 9 10 7 1 4 5 2 ...
Страница 135: ...Instruction SiBE12 519 126 System Configuration ...
Страница 211: ...Outdoor Unit SiBE12 519 202 Removal Procedure ...
Страница 212: ...SiBE12 519 Others 203 Part 8 Others 1 Others 204 1 1 Test Run from the Remote Controller 204 1 2 Jumper Settings 205 ...
Страница 223: ...Wiring Diagrams SiBE12 519 214 Appendix ...