SUPPLEMENT 69
BARO--VNAV APPROACHES
T B M
850
Edition 1 -- September 30, 2018
Rev. 0
Page 9.69.5
Phase of flight
Notes
ICAO Flight
Plan Code
Reference
Documents
Operational limitations
Approved
PBN
Capability
Phase of flight
Notes
Item
18
PBN/
Item
10a
Code
Reference
Documents
Operational limitations
Approved
PBN
Capability
Approach
RNP
APCH
LNAV
minima
(with and
without
RF legs)
At a minimum, the flight
director must be displayed
and
utilized
when
conducting
procedures
containing RF legs.
EASA
AMC 20-27
FAA
AC 90-105A
R
S1
Includes
non-
precision
approaches
based
on
conventional
navigation
aids
with ”or GPS” in
the title and area
navigation
approaches titled
”GPS”,
”RNAV
(GPS)”,
and
”RNAV (GNSS)”.
This
includes
procedures with
RF legs.
RF legs may be
used in the initial
and intermediate
legs
of
the
approach
pro-
cedure
or
the
final leg of the
missed approach
procedure only.
Approach
RNP
APCH
LNAV/
VNAV
minima
(with and
without
RF legs)
At a minimum, the flight
director must be displayed
and
utilized
when
conducting
procedures
containing RF legs.
QNH shall be available at
the
destination
airport
when conducting a Baro-
VNAV approach. Use of
remote altimeter setting
source is not allowed to
conduct
a
Baro-VNAV
approach.
The two primary altimeters
must be operational when
flying a RNP APCH LNAV/
VNAV with Baro-VNAV
guidance
EASA
AMC 20-27
FAA
AC 90-105A
R
S2
Includes
area
navigation
approaches titled
”RNAV
(GPS)”
and
”RNAV
(GNSS)”
This
includes
pro-
cedures with RF
legs.
Vertical guidance
is based on GPS/
SBAS
and/or
Baro-VNAV.
RF legs may be
used in the initial
and intermediate
legs
of
the
approach
pro-
cedure
or
the
final leg of the
missed approach
procedure only.
PIM - DO NOT USE FOR FLIGHT OPERATIONS
Содержание TBM 850
Страница 1: ...PILOT S INFORMATION MANUAL TBM 850 Edition 1 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 142: ...3 1 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 146: ...3 2 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 150: ...3 3 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 164: ...3 4 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 170: ...3 5 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 178: ...3 6 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 184: ...3 7 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 196: ...3 8 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 202: ...3 9 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 216: ...3 10 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 228: ...3 11 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 236: ...3 12 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 242: ...3 13 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 867: ...TBM 700 850 SUPPLEMENT 6 BFG STORMSCOPE Page 9 6 8 Rev 6 INTENTIONALLY LEFT BLANK PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Страница 1123: ...TBM 700 850 SUPPLEMENT 60 ADS B OUT FUNCTION Rev 4 Page 9 60 6 INTENTIONALLY LEFT BLANK PIM DO NOT USE FOR FLIGHT OPERATIONS ...