7-10-5. Order of CYCLE(R-600a) Repair Work (COMP Replacement)
- Connect Refrigerant
Discharge Hose
and draw it to
Outdoors
- Removal Time: 7min.
Stage 1.
Removal of R-600a
Refrigerant
Stage 2.
Removal of Residual
Refrigerant
Stage 3.
Comp/Dryer Replacement
& Pipe Welding
Stage 4.
Charging Ripple Welding
Stage 5.
Evacuation
Stage 6.
Injection of R-600a
Refrigerant
- Connect a vacuum
pump at the end of the
Refrigerant Discharge
Hose and remove the
residual Refrigerant
- Removal Time: 10min.
- Replace Comp & Dryer
- Weld each pipe
- Copper-Copper: 3%
Welding
- Copper-steel: 30%
Welding
- Charging Ripple
Welding
※Be sure to remove the
ripple cover and the
gas injection cover
before welding is done.
(Refer to Details)
- Connect Manifolder
Gauge to check
the evacuation.
- Evacuation Time:
60~80min.
- Inject Refrigerant to a
normal operation state.
- Removal Time: 10min.
65
Содержание Q600 series
Страница 7: ...3 1 Normal Compressor 3 Wiring Diagram 6...
Страница 8: ...3 2 Inverter Compressor 7...
Страница 9: ...4 1 FRQ 19D Dispenser only 4 External Size and Names of the Refrigerator 8...
Страница 10: ...4 2 FRQ 19F Dispenser H bar 9...
Страница 30: ...Contents 3 Ice Separation Mode 29...
Страница 61: ...INVERTER BOX COMPRESSOR 60 INVERTER Compressor VESD11C INVERTER Compressor ENV4A5G L2B...
Страница 101: ...10 4 How to install Water Line Dispenser Models only External Filter Type 100...
Страница 102: ...101...