8
-
1
maintenance
dSf75gt
8
-
1
8
-
1
maintenance
dSf75gt
8
-
1
8
5. Pull out the grain tank with pull the
retaining lever up.
6. Close the tank following the proce
-
dures in the reverse order of opening
the tank. Make sure to fix the tank
with the retaining pin and fit the belt.
(1) Retaining Lever
(A) Fit
When installing or removing
the concave, do it slowly to
prevent injuries.
When installing or removing
the concave, ensure the safety
of your footing and posture so
that you do not slip or fall off
the combine.
•
•
caution
1
1
2
2
CF1O827A
1
1
A
A
CF1O828A
4. Loosen the mounting bolt and
remove the belt from the pulley,
starting from the inner section to
-
wards the outer section.
(1) Mounting bolt
(2) Belt
reMoving and installing
concave
CF100(DSF75GT)_콤바인_영문판_08.indd 15
2017-07-03 오후 2:37:22
Содержание DSF75GT
Страница 2: ...CF100 DSF75GT _ _ _00 indd 2 2017 07 03 2 25 20...
Страница 61: ...3 General specifications 3 2 Specifications 3 CF100 DSF75GT _ _ _03 indd 1 2017 06 27 6 32 30...
Страница 64: ...MEMO MEMO CF100 DSF75GT _ _ _03 indd 4 2017 06 27 6 32 30...
Страница 88: ...MEMO MEMO CF100 DSF75GT _ _ _04 indd 24 2017 07 03 2 26 17...
Страница 94: ...MEMO MEMO CF100 DSF75GT _ _ _05 indd 6 2017 07 03 2 26 49...
Страница 148: ...MEMO MEMO CF100 DSF75GT _ _ _07 indd 42 2017 07 03 2 34 02...
Страница 216: ...MEMO MEMO CF100 DSF75GT _ _ _10 indd 10 2017 06 27 6 42 49...
Страница 217: ...11 INDEX INDEX 11 2 11 CF100 DSF75GT _ _ _11 indd 1 2017 07 03 2 41 04...
Страница 224: ...CF100 DSF75GT _ _ _11 indd 8 2017 07 03 2 41 04...