8
-
1
maintenance
dSf75gt
8
-
12
8
-
1
maintenance
dSf75gt
8
-
12
8
1. Hold the handle and push it down
to close the threshing unit top cov
-
er.
2. Fix it with the fixing handle.
hoW to fix threshing cylinder
B55O889A
cautions for auger installation
(1) Contact Auger Assembly (Bottom) Marking
(2) Main Blade
(3) Unloader Auger Shaft Assembly 1 (End)
B55O890A
(1) Unloader Auger 2 Assembly (Bottom) Marking
(2) Contact Auger Assembly (End)
When installing the unloader auger
2 assembly, its rod part marked as
(bottom) should face the contact
auger assembly and should be 90°
behind the blade direction of the con
-
tact auger assembly.
If reaping with the fixing han
-
dle not in the closing position,
the threshing unit frame can
be deformed, resulting in poor
reaping performance.
•
caution
installing unloader auger
shaft asseMbly 1 and con-
tact auger asseMbly
When installing the contact auger
assembly, its boss 2 part marked as
(bottom) should face the unloader
auger shaft assembly and should be
90° behind the main blade direction
of the unloader auger shaft.
installing contact auger
asseMbly and unloader au-
ger 2 asseMbly
CF100(DSF75GT)_콤바인_영문판_08.indd 13
2017-07-03 오후 2:37:22
Содержание DSF75GT
Страница 2: ...CF100 DSF75GT _ _ _00 indd 2 2017 07 03 2 25 20...
Страница 61: ...3 General specifications 3 2 Specifications 3 CF100 DSF75GT _ _ _03 indd 1 2017 06 27 6 32 30...
Страница 64: ...MEMO MEMO CF100 DSF75GT _ _ _03 indd 4 2017 06 27 6 32 30...
Страница 88: ...MEMO MEMO CF100 DSF75GT _ _ _04 indd 24 2017 07 03 2 26 17...
Страница 94: ...MEMO MEMO CF100 DSF75GT _ _ _05 indd 6 2017 07 03 2 26 49...
Страница 148: ...MEMO MEMO CF100 DSF75GT _ _ _07 indd 42 2017 07 03 2 34 02...
Страница 216: ...MEMO MEMO CF100 DSF75GT _ _ _10 indd 10 2017 06 27 6 42 49...
Страница 217: ...11 INDEX INDEX 11 2 11 CF100 DSF75GT _ _ _11 indd 1 2017 07 03 2 41 04...
Страница 224: ...CF100 DSF75GT _ _ _11 indd 8 2017 07 03 2 41 04...