7
-
harvest
dsF75gt
7
-
7
-
harvest
dsF75gt
7
-
(1) unloader
1. store and fix the unloader to its
support.
2. Check that the tank drive belt is
tight and the tank mounting bolt is
tightened firmly.
preparation of eaCH part before work
inspeCting tank
1
1
cf1O701a
1
1
2
2
cf1O702a
(1) tank mounting bolt
(2) tank driving belt
Cautions during work
1. never operate the threshing clutch
lever while the engine is running
at a low speed. the threshing unit
can be clogged or damaged.
2. It is hard to work on a small field
or on the edge of a field. For your
safety, work with care at a low
speed.
3. when switching between the cutter
and dropper operations, stop the
threshing unit in advance.
4. when the dust-proof cover on the
engine gets dusty during work,
clean it as necessary. if keeping
working with the dusty dust-roof
cover, the engine can be overheat-
ed.
CF100(DSF75GT)_콤바인_영문판_07.indd 4
2017-07-03 오후 2:33:25
Содержание DSF75GT
Страница 2: ...CF100 DSF75GT _ _ _00 indd 2 2017 07 03 2 25 20...
Страница 61: ...3 General specifications 3 2 Specifications 3 CF100 DSF75GT _ _ _03 indd 1 2017 06 27 6 32 30...
Страница 64: ...MEMO MEMO CF100 DSF75GT _ _ _03 indd 4 2017 06 27 6 32 30...
Страница 88: ...MEMO MEMO CF100 DSF75GT _ _ _04 indd 24 2017 07 03 2 26 17...
Страница 94: ...MEMO MEMO CF100 DSF75GT _ _ _05 indd 6 2017 07 03 2 26 49...
Страница 148: ...MEMO MEMO CF100 DSF75GT _ _ _07 indd 42 2017 07 03 2 34 02...
Страница 216: ...MEMO MEMO CF100 DSF75GT _ _ _10 indd 10 2017 06 27 6 42 49...
Страница 217: ...11 INDEX INDEX 11 2 11 CF100 DSF75GT _ _ _11 indd 1 2017 07 03 2 41 04...
Страница 224: ...CF100 DSF75GT _ _ _11 indd 8 2017 07 03 2 41 04...