7
-
harvest
dsF75gt
7
-
7
-
harvest
dsF75gt
7
-
(1) reel frame
(2) reel
(a) horizontal
2
A
2
A
1
1
1
cf1O721a
1. lower the reaping unit onto the
ground, set the reel frame parallel
to the ground, and stop the en-
gine.
1
2
5
3
4
6 7
1
2
5
3
4
6 7
cf1O722B
(1) reel drive belt (2) reel drive pulley
(3) hook
(4) retaining pin
(5) tension spring (6) adjusting bolt
(7) lock nut
2. remove the reel cover.
3. loosen the tension spring screw
to adjust the spring. then, remove
the belt from the reel drive pulley.
4. remove on both sides retaining
pins (4) and hooks (3) that fix the
reel onto the reel frame.
2
3
1
2
3
1
cf1O723B
5. move the reel to the front or back
to align the holes of the reel and
reel frame.
6. Fit the hooks into the holes on
both sides. Then, fit the retaining
pins.
7. adjust the tension of the tension
spring.
(1) hole (reel)
(2) hole (reel Frame)
(3) reel Frame
(a) adjust
CF100(DSF75GT)_콤바인_영문판_07.indd 32
2017-07-03 오후 2:34:00
Содержание DSF75GT
Страница 2: ...CF100 DSF75GT _ _ _00 indd 2 2017 07 03 2 25 20...
Страница 61: ...3 General specifications 3 2 Specifications 3 CF100 DSF75GT _ _ _03 indd 1 2017 06 27 6 32 30...
Страница 64: ...MEMO MEMO CF100 DSF75GT _ _ _03 indd 4 2017 06 27 6 32 30...
Страница 88: ...MEMO MEMO CF100 DSF75GT _ _ _04 indd 24 2017 07 03 2 26 17...
Страница 94: ...MEMO MEMO CF100 DSF75GT _ _ _05 indd 6 2017 07 03 2 26 49...
Страница 148: ...MEMO MEMO CF100 DSF75GT _ _ _07 indd 42 2017 07 03 2 34 02...
Страница 216: ...MEMO MEMO CF100 DSF75GT _ _ _10 indd 10 2017 06 27 6 42 49...
Страница 217: ...11 INDEX INDEX 11 2 11 CF100 DSF75GT _ _ _11 indd 1 2017 07 03 2 41 04...
Страница 224: ...CF100 DSF75GT _ _ _11 indd 8 2017 07 03 2 41 04...