D-Link DGS-3324SRi Intelligent Stackable Gigabit Ethernet Switch
2
Section 2
Installation
Package Contents
Before You Connect to the Network
Switch Installation
Connecting Stacked Switch Groups
Gigabit Combo Ports
External Redundant Power System
Connecting the Console Port
Password Protection
SNMP Settings
IP Address Assignment
Connecting Devices to the Switch
Package Contents
Before you begin installing the Switch, confirm that your package contains the following items:
•
One DGS-3324SRi Layer 3 Gigabit Switch
•
Mounting kit: 2 mounting brackets and screws
•
Four rubber feet with adhesive backing
•
One AC power cord
•
One PCMCIA CompactFlash memory card
•
This User’s Guide with Registration Card
•
CLI Reference
•
CD-ROM with User’s Guide and CLI Reference Manuals
Before You Connect to the Network
NOTICE:
Do not connect the Switch to the network until you have established the
correct IP settings.
Before you connect to the network, you must install the Switch on a flat surface or in a rack, set up a terminal
emulation program, plug in the power cord, and then set up a password and IP address.
The Switch is supplied with rubber feet for stationing it on a flat surface and mounting brackets and screws for
mounting the Switch in a rack.
NOTICE:
Do not connect the stacked switch group to the network until you have
properly configured all switches for switch stacking. An improperly configured
switch stack can cause a broadcast storm.