15
As shown in the figures: First we will remove
the security pins of the platform (4 units) and then
we shall lift the group of enclosures.
When lifting, we see that the group separates
from the platform, and we shall hear a few clicks
when selected angles will be blocked between the
enclosures.
Once that we have assigned the angle between the first pair of enclosures, acting on both sides of
enclosures, we shall repeat the same process to select the angle between the second and third. And so on
until the last.
We shall reallocate the angles of the example so that they may be more usual angles, we are going to
think of an array consisting of 8 enclosures.
Note:
The selected angles will be visible when we lift the enclosures, so before lifting the group you can
easily assign, and change, angles.
In this new case, we shall assign:
Between first and second: 0.5 °
Between second and third: 1
Between third and fourth: 1.5 °
Note that the angle is obtained by acting on the lower enclosure, so that we may have determined angle
between the fourth and fifth enclosures, you should act on the fifth when you have added it.
At this point, so that we may add more enclosures we should disengage the platform.
DETAIL
LIFT
1º
1º
1º
2º
Manual de Colgado
/ aero series /
Rigging Manual