Page 37 of 46
Gas Fire User Instructions
General
This fire is intended for decorative purposes. Any purpose-provided
ventilation should be checked regularly to ensure that it is free from
obstruction. The fire should be serviced regularly by a qualified person.
The chimney should be swept before the appliance is installed, and should
be swept and inspected regularly to ensure that all of the products of
combustion are entering the flue and there is no excessive build up of soot.
Do not throw rubbish et cetera upon the surface area or otherwise disturb
the fuel bed. Debris from any source, or soot formed, should be removed
from time to time, see ‘Cleaning instructions’.
The pilots ODS (Oxygen depletion sensor) must not be put out of
operation.
The user must not adjust the pilot.
If any of its parts are damaged and need to be exchanged the original
manufacturers parts must be used.
The pilot light and flame sensing device fitted to this fire is also an
atmosphere sensing device, which shuts off both the main burner and pilot
if evacuation of the combustion products is interrupted. If the fire shuts
itself off, restart the fire following the procedure in section 20.9.1 ‘Lighting
the fire’. If the fire continues to shut itself off do not use the fire, and have
the flue and fire checked by a suitably qualified person.
Once the flue and fire units have been checked and remedial action taken,
the fire is ignited in the manner depicted in section 20.9.1 ‘Lighting the
fire’.
Due to the newness of materials, the fire may give off a slight smell for a
period of time after commissioning. This is quite normal and any odours
should disperse within a few hours of operation.
For some countries a purpose provided air supply must be fitted in
accordance with National Regulations (e.g. Austria – minimum 100 cm
2
).
This fire should be checked regularly to ensure that it is free from
obstruction. A qualified person should service the fire regularly.
Содержание Double Sided Fire Ribbon
Страница 18: ...Page 18 of 46 Fitting the Enclosure...
Страница 19: ...Page 19 of 46...
Страница 20: ...Page 20 of 46...
Страница 21: ...Page 21 of 46...
Страница 22: ...Page 22 of 46...
Страница 28: ...Page 28 of 46 Guidance on Ventilation and Sealing...
Страница 32: ...Page 32 of 46 Remote Control Components Black Box Remote Valve NG Version LPG Version...
Страница 34: ...Page 34 of 46 NG Remote Wiring Diagram...
Страница 35: ...Page 35 of 46 LPG Remote Wiring Diagram...
Страница 39: ...Page 39 of 46...