9
ASSEMBLY AND OPERATING INSTRUCTIONS
—
CONTINUED
OPERATING CART —
continued
4. Load your follow bar, shoe and saddle by following the steps outlined below.
NOTE: For illustration purposes, only the 4" shoe and follow bar are being shown.
A. Open the gate on the front of the cart and slide the follow bar between the frame sides on the
bender, leaving approximately half of the follow bar on the transfer cart as shown in Figure 9A.
B. Open the gate in front of the bending shoe and slide the shoe toward the
follow bar as shown in Figure 9B.
Figure 9A
Figure 9B