5. The gates on the roller bed are installed
at the factory. Ensure that all eight gates
(two per row) are in place and operable.
To open, lift the gate from the spring side
and rotate towards the front of the cart.
To secure, return the gate to the retainer
hole. (See Figure 6).
LOADING CART
NOTE: Engage the brake on all casters before loading or removing components
1. A set of pins (two per sides) are mounted under the roller bed to store the four saddles. Pull the
spring clips out of the mounting holes and slide the saddles onto the pins with the “u” of the
saddle under the roller bed. Replace the spring clips to secure the saddles. (See Figure 6A).
6
ASSEMBLY AND OPERATING INSTRUCTIONS
—
CONTINUED
Figure 6A
Figure 6
Gate
Spring
Side
Gate
Retainer
Hole