
24
CTC EcoAir 610M / 614M / 622M 400 V 3N~
ON
ON
1 2
OFF
ON
1 2
OFF
ON
1 2
OFF
ON
1 2
A1
A2
A3
A4
PE
B A G Sc
B A G Sc
B A G Sc
B A G Sc
Heat pumps in series connection
The last heat pump connected in series
Display
Gr
een
White
Br
own
Remove the jumper
(PE), connect the
screen to the next
heat pump here.
Connect each cable
to the next heat
pump in the series
connection here.
Make sure DIP switch 2 is in the ON
position on the last heat pump in the
series connection.
The jumper (PE) must be left in place.
Display
Gr
een
White
Br
own
Содержание 588400001
Страница 2: ......
Страница 32: ...32 CTC EcoAir 610M 614M 622M 400 V 3N 6 9 Wiring diagram 400 V 3N A3...
Страница 33: ...33 CTC EcoAir 610M 614M 622M 400 V 3N...
Страница 34: ...34 CTC EcoAir 610M 614M 622M 400 V 3N 6 10 Wiring diagram 400 V 3N A4...
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 012 162 505 89 1 2020 09 14...