HV Breakout Module – Appendix
Installation Manual
41
Version 01.20 // 2021
7.1.3 HV BM 1.1 connection example, cable cross-section 2x 6 mm²
Cable
Coroplast FHLR2GCB2G 2 x 6 mm²
Ring terminals
ART1520512 Ring Terminal Set 6 mm² HV BM 1.1 (HW rev. A)
ART1520532 Ring Terminal Set 6 mm² HV BM 1.1 (as of HW rev. E)
PG gland
ART1520201 PG cable gland set 11/20 HV BM
Fig. 7-12: Step 1: Removing the outer sheath
"
Remove the outer sheath over a length of 75 mm. Make sure that the shielding
mesh lying underneath will not be damaged.
Fig. 7-13: Step 2: Removing the protective foil.
"
Remove the protective foil from the shielding mesh.
Fig. 7-14: Step 3: Applying a mark on the shielding
"
Mark a 20 mm wide segment on the shielding mesh.
"
Remove the remaining shielding mesh.
Fig. 7-15: Step 4: Marking the inner sheath
"
Apply a mark on the inner sheath with a distance of 3 mm to the end of the