HV Breakout Module – Mounting and installation
Installation Manual
17
Version 01.20 // 2021
NOTE!
Please note that the shield of the HV power cable must be connected to
the PG gland and the housing.
f
With a correspondingly prepared HV power cable, this can be done by
means of the spring, which provides a connection between the shield
and the the PG gland when the pressure screw is tightened.
9
f
Alternatively, the shield and housing can be directly connected by using
the four M3 threaded holes in the HV BM module housing (Fig. 4-10).
Fig. 4-10: HV BM 1.2, housing opened, M3 threaded holes marked
⃝
⃝
⃝
⃝
⃝
⃝
⃝
⃝
4.3.3.3 HV BM 1.x: Connecting the HV power cables
The scope of delivery of an HV BM 1.x includes four nuts for mounting the HV power cables
on the threaded bolts.
"
Prepare the nuts for mounting.
Fig. 4-11: HV BM 1.2, housing opened
↺
↺
↺
↺
↺
↺
↺
↺
If the nuts are already mounted:
"
Loosen the four nuts (
↺
) and remove them from the bolts.
⇨
Another four nuts become visible.
9 See chapter 4.3.3.6 "Tighten the PG glands and close the housing" and the manufacturer's catalogue (
fileadmin/user_upload/Downloads/Kataloge/Blueglobe_Katalog_2014_web.pdf
, p. 79).