18
2) Acceptable Vent Connectors - The following may be used for vent connectors:
•
Listed Type L vent.
•
Single Wall Galvanized Pipe - Use 0.018” (26 gauge) or heavier.
3) Chimney and Vent Connector Sizing - See Table 2 for minimum vent connector and chimney sizing.
4) Do not vent this appliance into any portion of a mechanical vent system operating under positive pressure.
5) Do not connect the boiler into a chimney flue serving an open fireplace or other solid fuel appliance.
6) Prior to boiler installation, inspect chimney for obstructions or other defects and correct as required. Clean chimney as
necessary.
7) Vent pipe should slope upward from the boiler not less than one inch in four feet. No portion of vent pipe should run
downward or have sags. Vent pipe must be securely supported.
8) The vertical section of vent pipe coming off the boiler should be as tall as possible, while still maintaining the proper
clearance from the horizontal vent connector to combustibles and the proper pitch called for in (7) above.
9) Vent pipe should be installed above the bottom of the chimney to prevent blockage.
10) Vent pipe must be inserted flush with inside face of the chimney liner and the space between vent pipe and chimney
sealed tight. A thimble permanently cemented in place can be used to facilitate removal of chimney connector for cleaning.
11) Install the barometric draft regulator in accordance with the regulator manufacturer’s instructions.
12) Secure all joints in the vent connector system with sheet metal screws. This includes the joint between the vent
connector and the boiler collar, as well as the barometric draft regulator. Use at least three screws at each joint.
TABLE 7.1: MINIMUM RECOMMENDED BREECHING AND CHIMNEY SIZE
Round I.D. (in) Rectangular I.D. (in)
Height (ft)
KSB065
6
6
8 x 8
15
KSB075
6
6
8 x 8
15
KSB100
6
6
8 x 8
15
KSB125
7
7
8 x 8
15
KSB150
7
7
8 x 8
15
KSB175
8
8
8 x 8
15
KSB200
8
8
8 x 8
15
Boiler
Model
Min Breeching
Dia. (inches)
Min. Recommended Chimney Size and Height
Содержание KSB Series
Страница 2: ...2...
Страница 12: ...10 FIGURE 4 1 FIELD INSTALLATION OF FLUE BAFFLES...
Страница 18: ...16 FIGURE 6 4 ALLAIR FROM OUTDOORS USING HORIZONTAL DUCTS INTO BOILER ROOM...
Страница 32: ...30 FIGURE 11 2 INDIRECT WATER HEATER FIELD WIRING...
Страница 43: ...41...