8
CAUTION
As with all oil-fired appliances, “Power Venting” this boiler creates a number of potential
problems, especially when this is done through a side wall. These include, but are not
necessarily limited to:
• Accelerated rate of soot buildup on the oil burner cad-cell, burner head, and/or in the
boiler
itself.
• Odor complaints
• Severe damage to the side of the structure in the event that the boiler operates at a high
smoke
level.
These problems can occur for many reasons, some of which are out of the control of both the
installer and the appliance manufacturer. The use of a chimney to vent this boiler is therefore
recommended. If a power venter must be used, it is the responsibility of the installer and power
venter manufacturer to “engineer” the power vent system.
CROWN BOILER CO. WILL ASSUME
NO RESPONSIBILITY FOR DAMAGE TO SIDING, ETC. FROM A POWER VENTED OIL-FIRED
BOILER. THIS APPLIES REGARDLESS OF THE CAUSE OF THE SOOTING.
IV. Field Assembly (“Shorty” Boilers Only)
This boiler is shipped in two main pieces:
a. The crated boiler itself with the following loose parts packed in one or more cartons that are glued to the skid:
• Barometric Draft Regulator
• Safety valve
• Pipe Fittings
• Loose Flue Baffles (KSB100 Only)
b. The burner carton consisting of the following items:
• Oil Burner assembly complete with cord and nozzle installed. This nozzle is for the highest firing rate on which
that burner can be used. See Table 4.0 below.
• An extra nozzle, and in some cases a low firing rate baffle, is shipped loose in the burner carton to allow the
burner to be down-fired to the next smaller model. See Table 4.0 for details.
It is recommended that the boiler be moved to its final location before the items in the burner carton are installed. To
complete field assembly:
1) Make sure that the burner carton supplied is the correct one for the boiler. The crate tag on the boiler, and the boiler’s
rating plate, list the Crown part numbers for the burner cartons that may be used with the boiler.
2) Remove the burner mounting bolts and washers from the front door. Make sure that the burner gasket is in place and
undamaged. Mount the burner to the door.
WARNING
Installation of burners other than those provided by Crown, and marked for use with this boiler, may result in
unreliable operation, property damage, personal injury, or loss of life.
NOTICE
In addition to the boiler and burner cartons described above, this boiler also requires a Riello AL1008 24V
Switching Relay (Crown PN130080) when it is installed with the 131521R or 131522R burner boxes.
Содержание KSB Series
Страница 2: ...2...
Страница 12: ...10 FIGURE 4 1 FIELD INSTALLATION OF FLUE BAFFLES...
Страница 18: ...16 FIGURE 6 4 ALLAIR FROM OUTDOORS USING HORIZONTAL DUCTS INTO BOILER ROOM...
Страница 32: ...30 FIGURE 11 2 INDIRECT WATER HEATER FIELD WIRING...
Страница 43: ...41...