background image

8

CAUTION

As with all oil-fired appliances, “Power Venting” this boiler creates a number of potential 

problems, especially when this is done through a side wall. These include, but are not 

necessarily limited to:

 

•  Accelerated rate of soot buildup on the oil burner cad-cell, burner head, and/or in the  

  boiler 

itself.

 

•  Odor complaints

 

•  Severe damage to the side of the structure in the event that the boiler operates at a high  

  smoke 

level. 

These problems can occur for many reasons, some of which are out of the control of both the 

installer and the appliance manufacturer. The use of a chimney to vent this boiler is therefore 

recommended. If a power venter must be used, it is the responsibility of the installer and power 

venter manufacturer to “engineer” the power vent system.

 

CROWN BOILER CO. WILL ASSUME 

NO RESPONSIBILITY FOR DAMAGE TO SIDING, ETC. FROM A POWER VENTED OIL-FIRED 

BOILER. THIS APPLIES REGARDLESS OF THE CAUSE OF THE SOOTING.

IV. Field Assembly (“Shorty” Boilers Only)

This boiler is shipped in two main pieces:

 

a.  The crated boiler itself with the following loose parts packed in one or more cartons that are glued to the skid: 

 

 

•    Barometric Draft Regulator

 

 

•    Safety valve

 

 

•    Pipe Fittings

 

 

•    Loose Flue Baffles (KSB100 Only)

 

b.  The burner carton consisting of the following items:

 

 

•    Oil Burner assembly complete with cord and nozzle installed. This nozzle is for the highest firing rate on which       

                      that burner can be used. See Table 4.0 below. 

 

 

•    An extra nozzle, and in some cases a low firing rate baffle, is shipped loose in the burner carton to allow the  

 

 

 

    burner to be down-fired to the next smaller model. See Table 4.0 for details.

 

It is recommended that the boiler be moved to its final location before the items in the burner carton are installed. To  

 

 

complete field assembly: 

 

1) Make sure that the burner carton supplied is the correct one for the boiler. The crate tag on the boiler, and the boiler’s    

 

rating plate, list the Crown part numbers for the burner cartons that may be used with the boiler.

 

 

2) Remove the burner mounting bolts and washers from the front door. Make sure that the burner gasket is in place and    

 

undamaged. Mount the burner to the door.

 

WARNING

Installation of burners other than those provided by Crown, and marked for use with this boiler, may result in 

unreliable operation, property damage, personal injury, or loss of life. 

NOTICE

In addition to the boiler and burner cartons described above, this boiler also requires a Riello AL1008 24V 

Switching Relay (Crown PN130080) when it is installed with the 131521R or 131522R burner boxes.

Содержание KSB Series

Страница 1: ...19134 www crownboiler com WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or loss of life For assistance or additional information consult a...

Страница 2: ...2...

Страница 3: ...s from this instruction manual Authorities having jurisdiction should be consulted before installations are made are made In all cases reference should be made to the following Standards In all cases...

Страница 4: ...e responsibility of the installing contractor to see that all controls are correctly installed and are operating properly when the installation is completed This boiler is not suitable for direct inst...

Страница 5: ...nattended during cold weather unless alarms or other safeguards are in place to prevent such damage DO NOT BLOCK AIR FLOW into or around the boiler Insufficient air may cause the boiler to produce car...

Страница 6: ...CSA C22 1 in Canada and any local regulations WARNINGS FOR THE INSTALLER WARNING This boiler must be properly vented The chimney must be inspected for any obstructions and cleaned prior to each heatin...

Страница 7: ...IV Field Assembly 8 V Locating the Boiler 11 VI Air for Combustion Ventilation 12 VII Venting 17 VIII System Piping 19 IX Indirect Tankless Water Heater Piping 21 X Fuel Line Piping 23 XI Wiring 26 X...

Страница 8: ...TIONS GAL HR MBH Sq ft MBH 1 20 1 50 1 75 1 90 KSB175 KSB200 KSB150 B C BURNER INPUT 0 65 0 75 1 00 79 A 85 1 HEATING CAPACITY NET AHRI RATING STEAM AFUE 91 85 1 KSB065 KSB075 KSB100 KSB125 DIMENSIONS...

Страница 9: ...industry accepted sizing method such as the I B R Guide RHH published by the Air Conditioning Heating and Refrigeration Institute AHRI 4 In some cases boilers installed at altitudes above 2000ft may...

Страница 10: ...Pipe Fittings Loose Flue Baffles KSB100 Only b The burner carton consisting of the following items Oil Burner assembly complete with cord and nozzle installed This nozzle is for the highest firing ra...

Страница 11: ...the instruction manual envelope and apply it next to the rating plate TABLE 4 0 FIELD ASSEMBLY COMPONENTS BURNER1 BOILER MODEL KSB0652 KSB075 KSB100 KSB125 KSB150 KSB175 KSB200 BECKETT CROWN CARTON PA...

Страница 12: ...10 FIGURE 4 1 FIELD INSTALLATION OF FLUE BAFFLES...

Страница 13: ...this clearance is reduced A 24 service clearance is required on the left side of boilers equipped with float type low water cut offs This is to facilitate low water cut off maintenance 2 If listed Ty...

Страница 14: ...osphere have a continuous water vapor retarder with a rating of 1 perm or less with openings gasketed and sealed Weather stripping has been added on openable windows and doors Caulking and sealants ar...

Страница 15: ...of adjoining spaces only if no doors are installed between them If doors are installed between the boiler room and an adjoining space do not consider the volume of the adjoining space even if the door...

Страница 16: ...an opening takes into account the blocking effect of mesh grills and louvers Where screens are used they must be no finer than 4 x 4 mesh For Buildings of Unusually Tight Construction 1 Openings must...

Страница 17: ...15 FIGURE 6 2 ALLAIR FROM OUTDOORS VIA VENTILATED ATTIC FIGURE 6 3 ALLAIR FROM OUTDOORS USING OPENINGS INTO BOILER ROOM...

Страница 18: ...16 FIGURE 6 4 ALLAIR FROM OUTDOORS USING HORIZONTAL DUCTS INTO BOILER ROOM...

Страница 19: ...nry Chimney The masonry chimney must be constructed in accordance with the latest edition of Standard for Chimneys Fireplaces Vents and Solid Fuel Burning Appliances NFPA 211 and lined with a clay lin...

Страница 20: ...e proper clearance from the horizontal vent connector to combustibles and the proper pitch called for in 7 above 9 Vent pipe should be installed above the bottom of the chimney to prevent blockage 10...

Страница 21: ...occur Short cycling on low water Boiler or system Flooding Hammering Failure to heat one or more radiators VIII System Piping WARNING Install boiler so that the electrical components are protected fr...

Страница 22: ...require Hartford loops 5 Do not use a check valve in place of or in addition to a Hartford loop on a gravity return system 6 Pipe the fill connection from a clean source of cold water When the water...

Страница 23: ...for wiring information 2 Y Strainer Install a Y strainer to prevent sediment from accumulating inside the indirect water heater 3 Check Valve Prevents gravity circulation through the indirect water he...

Страница 24: ...ed to excessive temperatures when no water is flowing through the coil 3 DHW Pressure Relief Valve Required Limits the pressure in the tankless heater and piping Use an ASME constructed valve designed...

Страница 25: ...fer also to the instruction manuals provided with the burner WARNING Under no circumstances can copper with sweat style connectors be used Do not use compression fittings Oil piping must be absolutely...

Страница 26: ...ld be converted to a one pipe gravity system as doing so will result in lower inlet line flow and longer filter life d TWO PIPE LIFT SYSTEM used when a fuel oil storage tank is located below an oil bu...

Страница 27: ...uel pump Use heavy wall copper tubing in a continuous run On two pipe systems the return line should terminate 3 4 above suction line depth within the storage tank Refer to the pump manufacturer s ins...

Страница 28: ...he National Electrical Code ANSI NFPA 70 Disconnect electrical power to the boiler and heating system before servicing Positively assure that no voltage is present Lock electrical boxes to prevent som...

Страница 29: ...ring Install the L4006A with the 3 4 NPT well in the 3 4 tapping in the center of the coil plate Make sure that the sensing bulb of this control is fully bottomed out in the well Route the wire harnes...

Страница 30: ...28 FIGURE 11 0 120V BOILER CONNECTIONS DIAGRAM See Figs 11 1a c for burner and low voltage thermostat wiring Beckett 7505 FIGURE 11 1a CONNECTIONS DIAGRAM FOR BECKETT BURNER PRIMARY CONTROL...

Страница 31: ...29 Carlin 40200 FIGURE 11 1b CONNECTIONS DIAGRAM FOR CARLIN BURNER PRIMARY CONTROL Riello 530SE FIGURE 11 1c CONNECTIONS DIAGRAM FOR RIELLO BURNER PRIMARY CONTROL...

Страница 32: ...30 FIGURE 11 2 INDIRECT WATER HEATER FIELD WIRING...

Страница 33: ...s for more details 14 Immediately upon firing the boiler check the smoke level If the smoke level is in excess of a 1 open the air adjustment to bring the smoke level below a 1 15 Make sure that the o...

Страница 34: ...has been installed and put into continuous operation for several days clean the boiler of oil grease sludge and other contaminants that may have been present in existing piping This will prevent unste...

Страница 35: ...DRAFT OVER FIRE in w c MAX SMOKE bacharach scale FLUE CO2 MIN 11 0 11 0 11 0 11 0 11 0 11 0 11 0 MAX 12 5 13 0 13 0 13 0 13 0 12 5 13 0 0 02 0 02 0 02 1 0 02 0 02 1 1 1 1 NONE NONE NONE NONE 1 0 02 0...

Страница 36: ...DEL DEL HAGO DEL NOZZLE 0 60 60A 0 85 60W 1 00 60A 1 25 60B 1 35 45B 1 65 45B PUMP PRESS psi 150 150 150 150 150 150 TURBULATOR 0 2 3 3 1 5 2 AIR SHUTTER SETTING 2 60 2 85 3 8 4 5 3 3 8 DRAFT OVER FI...

Страница 37: ...or other deterioration Replace any defective vent system components a Temporarily install a 1 1 4 inch or larger full port ball valve in place of the 1 1 2 plug Temporarily pipe the outlet of this val...

Страница 38: ...valve immediately if valve fails to relieve pressure 11 Open fuel line shut off valve s and restore electrical power to the boiler 12 Fire the boiler and check it out using the procedure outlined in S...

Страница 39: ...g sleeved loose fitting clothing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separately f...

Страница 40: ...gas leakage into the building resulting in odor complaints 6 Dirt The use of a fuel filter is required Accidental accumulation of dirt in the fuel system can clog the nozzle or nozzle strainer and pro...

Страница 41: ...70021 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 17 FLAME INSPECTION COVER 290022 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 18 5 16 18 X 3 4 HEX HEAD CAP SCREW 900400 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 19 1 2 x 1 SE...

Страница 42: ...450 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 48 GLASS SET 950078 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 49 PRESSURE LIMIT CONTROL L404F1367 3503800 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 50 90 DEGREE BRASS PIGTAIL...

Страница 43: ...41...

Страница 44: ...42 Manufacturer of Hydronic Heating Products P O Box 14818 3633 I Street Philadelphia PA 19134 www crownboiler com...

Отзывы: