28
Lotem 400/ Lotem 400 Quantum Site Preparation Guide
5.
Do the doors and hallways between the shipping dock and the installation
have sufficient area to allow passage of the shipping crates? (See
6.
Can the receiving area accommodate a typical air ride truck—that is, does it
have dock level? (See
7.
Will the room’s temperature control system be able to handle the heat load
generated by the device and the processor line? (See
8.
Will the room’s humidity control system be able to handle the moisture load
generated by the processor line?
Yes
No
Comments:
Yes
No
Comments:
Yes
No
Comments:
Yes
No