32
Lotem 400/ Lotem 400 Quantum Site Preparation Guide
Follow Up
Is follow-up required?
The outstanding items from the Site Requirements list are:
No
The location described in this document meets all criteria for a
timely and successful installation of the Lotem 400 / Lotem 400
Quantum.
Yes
Some follow-up is required to ensure that the site requirements are
met
prior
to the installation of the device.
Name of customer contact:
Telephone/fax:
E-mail:
Date of next follow-up contact: