Site Inspection Checklist
31
Air supply qualification test results
17.
Is the air supply filtered and dried as per specification? (See
page 13.).
18.
Are the voice and data telephone lines installed?
19.
What type of network connection is used?
Part number of measurement tool:
First Test
Second Test
Third Test
Time on
Pressure
Time on
Pressure
Time on
Pressure
10 Sec
10 Sec
10 Sec
20 Sec
20 Sec
20 Sec
30 Sec
30 Sec
30 Sec
40 Sec
40 Sec
40 Sec
50 Sec
50 Sec
50 Sec
60 Sec
60 Sec
60 Sec
Yes
No
Prefilter ordered
Comments:
Yes
No
Modem number:
Comments: