background image

© Copyright 2016, Creative Playthings

NORTHBRIDGE WOOD ROOF
19950-100 Rev C (05-18)

Page 22

ASSEMBLY INSTRUCTIONS

Check that all connections are secure and the area is clear of tools before allowing children to play on 

the swing set. Save all instructions and receipts in case it becomes necessary to contact Creative Play-

things for warranty service and/or part replacement. The warranty can be found in your Owner’s Manual.

STEP 36 – Slide Mount:

Place the Slide Mount (X) tight against the front Main Beam, centered 

on the opening left for the slide. The beveled edge of the Slide Mount 

should face the inside of the gym. Secure the Slide Mount to the Platform 

Boards using four #8 x 2-1/2" Flat Head Wood Screws.

Drive the screws until the heads are flush with the top of the Slide Mount. 

Do not over-tighten; over-tightening may cause the points of the screws 

to protrude through the bottom of the Platform Boards.

X

AS

STEP 37 – Slide:

Position the Slide (AS) onto the Slide Mount through the opening pre-

pared in earlier steps. Center the Slide in the opening and pull it tight 

to the platform until it stops against the edge of the front Main Beam. 

Make sure the holes in the Slide are over the Slide Mount.
Ensure the Slide extends out perpendicular from the Playset.
Drill 5/16" holes through the Slide, Slide Mount, and Deck Boards us-

ing the holes in the Slide as a guide. Fasten the slide using one 1/4 x 

3" Truss Head Bolt and one 1/4" Weld Nut for each hole.

Note: Depending on the Slide, you may find the holes you drill en

-

counter a framing member. If so, stop drilling after piercing the Deck 

Board. Remove the Slide Mount and Deck Board and insert the Weld 

Nuts from the underside. If desired, a 1" spade drill bit can be used 

to clear a space for the base of the Weld Nut in the framing member. 

Re-attach the Platform Board and Slide Mount and continue securing 

the Slide.

STEP 39 – Hang Swings:

Hang the Swings in the positions shown at left. 

It is 

important to hang the Ring Trapeze in the posi-

tion closest to the gym. 

U.S. safety standards require a minimum clearance 

of 8" from the bottom of each Swing Accessory to 

the ground. U.K. (& E.U.) safety standards require 

a minimum clearance of 350mm (13-3/4") between 

the bottom of each Swing Accessory and the ground.
The height of each Swing Accessory is adjusted by 

using a different link in the chain. Be sure to hang the 

Swings Accessories with ground clearance greater 

than or equal to the safety standard for your region.

#8 x 2-1/2" 

Screw

1/4 x 3" Truss 

Head Bolt

Содержание NORTHBRIDGE WOOD ROOF

Страница 1: ...t care to design its products with your child s safety in mind However only with careful supervision and proper safety instructions can you be assured of safe play time on any product designed for chi...

Страница 2: ...ectrical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow mor...

Страница 3: ...t to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures landsc...

Страница 4: ...w 10 x 2 1 2 Self Drill Screw 8mm Flat Washer 1 4 x 1 1 2 Lag Screw 1 4 Lock Washer 1 4 Weld Nut 1 4 x 1 1 2 Hex Bolt 5 16 Flat Washer 5 16 Lock Washer 5 16 Weld Nut 5 16 x 3 1 2 Lag Screw 5 16 x 4 1...

Страница 5: ...SAFER PLAY PRODUCT FOR YOUR CHILDREN Hex Bolt Weld Nut Assembly Procedure Assembly Layout Align the holes in the parts to be fastened Start preliminary tightening of bolt into weld nut by hand Tighte...

Страница 6: ...Copyright 2016 Creative Playthings NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Page 6 PLAYSET VIEW A B C D F G H I J K U M N P AB AC AD AE AJ AI AM W AK AL AS AT S V Y Z AA L AN...

Страница 7: ...Spacer 54 x 4 x 27 1 4 V 1 50277 100 Rock Pack 12 Green W 1 40400 100 Climbing Rope X 1 15133 400 Slide Mount Green Y 5 14203 400 Steel Rung Green 1 Dia x 18 Z 10 15154 400 Rung Collar Green 1 Dia x...

Страница 8: ...ation If upon inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creative Playthings Customer Service Oil all metallic moving parts mo...

Страница 9: ...k Q to the front of the Inside Beam using two 5 16 x 6 Hex Bolt Assemblies Repeat with the other Main Beam and Center Block at the back of the platform frame Fasten a Post AI to the Main Beam and plat...

Страница 10: ...e Support H to the Posts on the left side of the gym using four 5 16 x 4 1 2 Hex Bolt Assemblies Note the position of the rope hole in the Upper Rope Support The hole should be closest to the back of...

Страница 11: ...to Back With the help of another person gently tip the assembly onto its back with the Weld Nuts facing the ground STEP 7 Step Leg Slide the Step Leg AC into place between the back Main Beam and the b...

Страница 12: ...in the Main Beam Fasten the Step Leg to the back Main Beam with 3 8 x 4 1 2 Hex Bolt Assemblies Fasten the Leg to the Rope Base Rail as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 10 Left B...

Страница 13: ...n using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 12 Rung Leg Slide the Rung Leg AB into place between the front Main Beam and the front Inside Beam as shown Place the angled face of the leg flush to...

Страница 14: ...Side Support AE to the Rope Base Rail using one 5 16 x 3 Hex Bolt Assembly through one hole Swing the Side Support to rest against the side of the Leg Mark and drill a 1 4 diameter pilot hole into th...

Страница 15: ...STEP 18 Steps Slide the Ladder Steps C into the Slots in the Step Support and the Step Leg Make the bottom front edge of each Step even with the face of the Step Support and Step Leg Fasten the Steps...

Страница 16: ...ling Screws through the pre drilled holes from below Drill the Screws up through the steel pipe until the head of the screw is flush with the surface of the wood STEP 22 Stringers Fasten the Stringer...

Страница 17: ...using four 10 x 2 1 2 T25 Screws Use 1 8 diameter pilot holes to ensure the screws do not split the Rung Support and Leg Align the bottom edge of the Rope Board K with the bottom edge of the Rung Supp...

Страница 18: ...alling seven more Roof Boards sliding them under the previous Roof Board and fastening the Roof Boards using 8 x 1 5 8 Screws Leave off the final two Roof Boards for now Final Roof Boards Before attac...

Страница 19: ...her Fasten a Ceiling Joist AN to the outside of the Roof Rafters on each end Use two 5 16 x 3 Hex Bolt Assemblies Fasten the remaining Ceiling Joists to the other Roof Raf ters using two 5 16 x 3 Hex...

Страница 20: ...HE ROPE BE UNTIED OR LOOSE ENOUGH TO FORM A LOOP THIS PRESENTS EX TREME DANGER TO YOUR CHILDREN Figure 8 Knot STEP 30 Hand Grips Place one Hand Grip I flat against the outside face of the left back Po...

Страница 21: ...t when fully tightened Pull down on the cargo net to tighten the knots Fasten the bottom of the Cargo Net to the Rope Base Rail by passing the end of each rope through a hole and tying a knot At least...

Страница 22: ...re the holes in the Slide are over the Slide Mount Ensure the Slide extends out perpendicular from the Playset Drill 5 16 holes through the Slide Slide Mount and Deck Boards us ing the holes in the Sl...

Страница 23: ...Assembly NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Copyright 2016 Creative Playthings Page 23 ASSEMBLY INSTRUCTIONS...

Отзывы: