background image

© Copyright 2016, Creative Playthings

NORTHBRIDGE WOOD ROOF
19950-100 Rev C (05-18)

Page 20

ASSEMBLY INSTRUCTIONS

STEP 31 – Climbing Rope:

The Climbing Rope Assembly comes pre-knotted on approximately 12" cen-

ters. This is done to prevent the rope from separating and it provides a better 

grip. DO NOT MODIFY THE DESIGN OF THIS ROPE. IF THE ROPE IS 

REPLACED, IT IS EXTREMELY IMPORTANT THAT YOU MAINTAIN THE 

SAME DESIGN AND CONSTRUCTION.
Insert the Climbing Rope (W) though the hole in the Upper Rope Support. Tie 

a figure eight knot at the end of the rope, inside the gym. Leave at least 2" of 

rope beyond the end of the knot.
Pre-stretch the rope before tieing the bottom end. The bottom end of the Rope 

MUST pass through the hole in the Rope Board and Rock Base Rail. Pull the 

Rope through the hole until it is tight and tie a knot in the end. A figure-eight 

knot is preferred, but an overhand knot can be used in the lower position.
Check the rope periodically to ensure that it has not loosened. Tighten the 

rope when necessary.

WARNING:  AT NO TIME SHOULD THE BOTTOM END OF THE ROPE BE 

UNTIED OR LOOSE ENOUGH TO FORM A LOOP. THIS PRESENTS EX-

TREME DANGER TO YOUR CHILDREN.

Figure 8 

Knot

STEP 30 – Hand Grips:

Place one Hand Grip (I) flat against the outside face of the left 

back Post as shown. The bottom hole of the Hand Grip should 

be approximately 1-1/2" above the top of the angled Leg.
With the Hand Grip centered on the face of the Post, mark the 

positions of the holes in the Hand Grip. Drill 1/8" diameter pilot 

holes 1" deep at the marks. Fasten the Hand Grip using two 

1/4" x 1-1/2" Lag Screws and two 8mm Flat Washers.

Place one Hand Grip flat against the outside face of the front 

left Leg as shown. The top hole of the Hand Grip should be ap-

proximately 5-1/2" below the top of the angled Leg.
With the Hand Grip centered on the surface of the Leg, mark 

the positions of the holes in the Grip. Drill and fasten the Hand 

Grip as above.
Repeat with the remaining Grips on the other end of the gym on 

the front right Post and back right Leg.

I

W

STEP 32 – Ladder Slat:

Place the Ladder Slat (A) against the underside of the Rung 

Leg and Rung Support. The top of the Ladder Slat should be 

up against the bottom of the Platform End.
Secure the Ladder Slat using four #8 x 1-5/8" Screws.

1/4 x  1-1/2" 

Lag Screw

1-1/2"

5-1/2"

A

#8 x 1-5/8" 

Screw

Overhand 

Knot

Содержание NORTHBRIDGE WOOD ROOF

Страница 1: ...t care to design its products with your child s safety in mind However only with careful supervision and proper safety instructions can you be assured of safe play time on any product designed for chi...

Страница 2: ...ectrical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow mor...

Страница 3: ...t to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures landsc...

Страница 4: ...w 10 x 2 1 2 Self Drill Screw 8mm Flat Washer 1 4 x 1 1 2 Lag Screw 1 4 Lock Washer 1 4 Weld Nut 1 4 x 1 1 2 Hex Bolt 5 16 Flat Washer 5 16 Lock Washer 5 16 Weld Nut 5 16 x 3 1 2 Lag Screw 5 16 x 4 1...

Страница 5: ...SAFER PLAY PRODUCT FOR YOUR CHILDREN Hex Bolt Weld Nut Assembly Procedure Assembly Layout Align the holes in the parts to be fastened Start preliminary tightening of bolt into weld nut by hand Tighte...

Страница 6: ...Copyright 2016 Creative Playthings NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Page 6 PLAYSET VIEW A B C D F G H I J K U M N P AB AC AD AE AJ AI AM W AK AL AS AT S V Y Z AA L AN...

Страница 7: ...Spacer 54 x 4 x 27 1 4 V 1 50277 100 Rock Pack 12 Green W 1 40400 100 Climbing Rope X 1 15133 400 Slide Mount Green Y 5 14203 400 Steel Rung Green 1 Dia x 18 Z 10 15154 400 Rung Collar Green 1 Dia x...

Страница 8: ...ation If upon inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creative Playthings Customer Service Oil all metallic moving parts mo...

Страница 9: ...k Q to the front of the Inside Beam using two 5 16 x 6 Hex Bolt Assemblies Repeat with the other Main Beam and Center Block at the back of the platform frame Fasten a Post AI to the Main Beam and plat...

Страница 10: ...e Support H to the Posts on the left side of the gym using four 5 16 x 4 1 2 Hex Bolt Assemblies Note the position of the rope hole in the Upper Rope Support The hole should be closest to the back of...

Страница 11: ...to Back With the help of another person gently tip the assembly onto its back with the Weld Nuts facing the ground STEP 7 Step Leg Slide the Step Leg AC into place between the back Main Beam and the b...

Страница 12: ...in the Main Beam Fasten the Step Leg to the back Main Beam with 3 8 x 4 1 2 Hex Bolt Assemblies Fasten the Leg to the Rope Base Rail as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 10 Left B...

Страница 13: ...n using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 12 Rung Leg Slide the Rung Leg AB into place between the front Main Beam and the front Inside Beam as shown Place the angled face of the leg flush to...

Страница 14: ...Side Support AE to the Rope Base Rail using one 5 16 x 3 Hex Bolt Assembly through one hole Swing the Side Support to rest against the side of the Leg Mark and drill a 1 4 diameter pilot hole into th...

Страница 15: ...STEP 18 Steps Slide the Ladder Steps C into the Slots in the Step Support and the Step Leg Make the bottom front edge of each Step even with the face of the Step Support and Step Leg Fasten the Steps...

Страница 16: ...ling Screws through the pre drilled holes from below Drill the Screws up through the steel pipe until the head of the screw is flush with the surface of the wood STEP 22 Stringers Fasten the Stringer...

Страница 17: ...using four 10 x 2 1 2 T25 Screws Use 1 8 diameter pilot holes to ensure the screws do not split the Rung Support and Leg Align the bottom edge of the Rope Board K with the bottom edge of the Rung Supp...

Страница 18: ...alling seven more Roof Boards sliding them under the previous Roof Board and fastening the Roof Boards using 8 x 1 5 8 Screws Leave off the final two Roof Boards for now Final Roof Boards Before attac...

Страница 19: ...her Fasten a Ceiling Joist AN to the outside of the Roof Rafters on each end Use two 5 16 x 3 Hex Bolt Assemblies Fasten the remaining Ceiling Joists to the other Roof Raf ters using two 5 16 x 3 Hex...

Страница 20: ...HE ROPE BE UNTIED OR LOOSE ENOUGH TO FORM A LOOP THIS PRESENTS EX TREME DANGER TO YOUR CHILDREN Figure 8 Knot STEP 30 Hand Grips Place one Hand Grip I flat against the outside face of the left back Po...

Страница 21: ...t when fully tightened Pull down on the cargo net to tighten the knots Fasten the bottom of the Cargo Net to the Rope Base Rail by passing the end of each rope through a hole and tying a knot At least...

Страница 22: ...re the holes in the Slide are over the Slide Mount Ensure the Slide extends out perpendicular from the Playset Drill 5 16 holes through the Slide Slide Mount and Deck Boards us ing the holes in the Sl...

Страница 23: ...Assembly NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Copyright 2016 Creative Playthings Page 23 ASSEMBLY INSTRUCTIONS...

Отзывы: