Assembly
NORTHBRIDGE WOOD ROOF
19950-100 Rev C (05-18)
© Copyright 2016, Creative Playthings
Page 17
ASSEMBLY INSTRUCTIONS
STEP 23 – Platform Boards:
Lay the Deck Boards (D) and Center Deck Board (E) across
the Stringers and Inside Beams in the pattern shown at right.
Push the outer-most Deck Boards tight against the Posts.
Space the other Boards evenly between the outer-most
Boards. Make sure the holes in the Center Deck Board align
with the holes in the Swivel Stringer. Secure the Boards us-
ing #8 x 1-5/8" Screws in each small hole. Do not use screws
in the larger holes in the Center Deck Board.
Place one End Deck Board (F) so it
overhangs the Stair
Platform End by 1/4"
. Evenly space another End Deck
Board between the first and the adjacent Deck Board. Se
-
cure the End Deck Boards using #8 x 1-5/8" Screws in each
small hole.
Repeat with the remaining End Deck Boards at the other
end of the platform,
overhanging the Ladder Platform End
1/4".
STEP 24 – Climber Boards:
Take one Rock Board (J) and insert four 1/4" Weld Nuts into
the four 5/16" diameter holes.
Align the top edge of the Rock Board with the top edge of the
Rung Support. Secure the Rock Board to the Rung Support
and back left Leg using four #10 x 2-1/2" T25 Screws.
Use
1/8" diameter pilot holes
to ensure the screws do not split
the Rung Support and Leg.
Align the bottom edge of the Rope Board (K) with the bottom
edge of the Rung Support and Leg. Make sure the Large hole
in the Rope Board is aligned closest to the ground. Secure
the Rope Board to the Rung Support and back left Leg using
four #10 x 2-1/2" T25 Screws.
Use 1/8" diameter pilot holes
to ensure the screws do not split the Rung Support and Leg.
Place the four Spacer Boards (L), Narrow Spacer (U), and
remaining five Rock Boards as shown at right. Secure the
Spacer and Rock Boards spaced evenly between the top
Rock Board and Rope Board using four #10 x 2-1/2" T25
Screws.
Use 1/8" diameter pilot holes
to ensure the screws
do not split the Rung Support and Leg.
The gap between
boards will be approximately 3/8".
STEP 25 – Rocks:
Fasten a Climbing Rock (V) to each pair of holes in the Rock
Boards. Use 1/4 x 1-1/2" Hex Bolts, 1/4" Lock Washers, 8mm
Flat Washers and 1/4" weld nuts. Do not over-tighten the
fasteners. The bolt must seat completely into the Climbing
Rock, and not protrude more than a 1/8" past the end of the
weld nut. Protruding bolts can be a hazard to users, replace
any protruding bolts.
V
K
U
L
J
E
D
D
D
D
D
D
D
D
F
F
F
F
Typical gap: 3/8"
1/4" Overhang
1/4 x 1-1/2" Hex Bolt
#10 x 2" Screw
Insert Weld Nuts before
installing top board.
#10 x 2-1/2" T25 Screws