background image

Assembly

NORTHBRIDGE WOOD ROOF

19950-100 Rev C (05-18)

© Copyright 2016, Creative Playthings

Page 21

ASSEMBLY INSTRUCTIONS

STEP 33 – Tire Swivel & Tire Swing:

The Tire Swivel can be found in the Tire Swing box. Fasten 

the Tire Swivel to the Bottom of the Swivel Stringer using 

four 5/16 x 2-1/2" Hex Bolt Assemblies through the Swivel 

Stringer and Center Deck Board as shown. Be sure to use 

Weld Nuts at the top, set into the Center Deck Board.
Locate the Tire Swing Assembly (AT) and place it be-

neath the Gym Platform. Make sure that the hard-

ware  is  fastened  firmly  to  the  Tire  and  that  the 

chains are not tangled.
Using the included quick-links, fasten each chain 

to the Tire Swivel, as shown. The height of the 

Tire Swing should be adjusted by putting the 

quick-link through a lower link in the chain. The 

standard installation is to loop the quick links to 

the third link from the End of the Chain.
Tighten the quick-links using a C-wrench.

AH

STEP 34 – Cargo Net:

Fasten the Cargo Net (AH) to the Stair Platform End by pass-

ing the end of each rope through a hole and tying a figure 

eight or overhand knot. Approximately 1" of rope should ex-

tend beyond the knot when fully tightened. Pull down on the 

cargo net to tighten the knots.
Fasten the bottom of the Cargo Net to the Rope Base Rail by 

passing the end of each rope through a hole and tying a knot. 

At least 1" of rope should extend beyond the knot.
It is important that the Cargo Net is as taut as possible. Peri-

odically check the knots are secure.

Be sure there is a space of at least 9" between the top 

horizontal rope and the bottom of the Stair Platform End.

Deck Boards shown cut-

away for clarity. Do not 

cut Deck Boards when 

assembling

Use the 3rd link 

on each chain.

Overhand 

Knot

Figure 8 

Knot

≥ 9"

5/16 x 2-1/2" 

Hex Bolt

STEP 35 – Wall Slats:

Evenly space six Wall Slats (B) between the back Post 

Assemblies. 

Hold  the  Wall  Slats  1/2"  above  the  Deck 

Boards. 

Fasten each Wall Slat to the back End Support and 

the back Main Beam using four #8 x 1-5/8" Screws. The gap 

will be approximately 2-3/8" between slats.
Secure one Wall Slat 24-3/8" from the right front Post 

using four #8 x 1-5/8" Screws. Evenly space two Wall Slats 

between the back front left Post and the Wall Slat. 

Hold the 

Wall Slats 1/2" above the Deck Boards.

 Fasten each Wall 

Slat to the front End Support and the front Main Beam using 

four #8 x 1-5/8" Screws. The gap will be approximately 2-3/4" 

between slats.

B

1/2" gap 

below all 

Slats

2-3/8" typical

2-3/4" 

typical

Back of the 

Gym

24-3/8"

#8 x 1-5/8" 

Screw

Содержание NORTHBRIDGE WOOD ROOF

Страница 1: ...t care to design its products with your child s safety in mind However only with careful supervision and proper safety instructions can you be assured of safe play time on any product designed for chi...

Страница 2: ...ectrical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow mor...

Страница 3: ...t to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures landsc...

Страница 4: ...w 10 x 2 1 2 Self Drill Screw 8mm Flat Washer 1 4 x 1 1 2 Lag Screw 1 4 Lock Washer 1 4 Weld Nut 1 4 x 1 1 2 Hex Bolt 5 16 Flat Washer 5 16 Lock Washer 5 16 Weld Nut 5 16 x 3 1 2 Lag Screw 5 16 x 4 1...

Страница 5: ...SAFER PLAY PRODUCT FOR YOUR CHILDREN Hex Bolt Weld Nut Assembly Procedure Assembly Layout Align the holes in the parts to be fastened Start preliminary tightening of bolt into weld nut by hand Tighte...

Страница 6: ...Copyright 2016 Creative Playthings NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Page 6 PLAYSET VIEW A B C D F G H I J K U M N P AB AC AD AE AJ AI AM W AK AL AS AT S V Y Z AA L AN...

Страница 7: ...Spacer 54 x 4 x 27 1 4 V 1 50277 100 Rock Pack 12 Green W 1 40400 100 Climbing Rope X 1 15133 400 Slide Mount Green Y 5 14203 400 Steel Rung Green 1 Dia x 18 Z 10 15154 400 Rung Collar Green 1 Dia x...

Страница 8: ...ation If upon inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creative Playthings Customer Service Oil all metallic moving parts mo...

Страница 9: ...k Q to the front of the Inside Beam using two 5 16 x 6 Hex Bolt Assemblies Repeat with the other Main Beam and Center Block at the back of the platform frame Fasten a Post AI to the Main Beam and plat...

Страница 10: ...e Support H to the Posts on the left side of the gym using four 5 16 x 4 1 2 Hex Bolt Assemblies Note the position of the rope hole in the Upper Rope Support The hole should be closest to the back of...

Страница 11: ...to Back With the help of another person gently tip the assembly onto its back with the Weld Nuts facing the ground STEP 7 Step Leg Slide the Step Leg AC into place between the back Main Beam and the b...

Страница 12: ...in the Main Beam Fasten the Step Leg to the back Main Beam with 3 8 x 4 1 2 Hex Bolt Assemblies Fasten the Leg to the Rope Base Rail as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 10 Left B...

Страница 13: ...n using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 12 Rung Leg Slide the Rung Leg AB into place between the front Main Beam and the front Inside Beam as shown Place the angled face of the leg flush to...

Страница 14: ...Side Support AE to the Rope Base Rail using one 5 16 x 3 Hex Bolt Assembly through one hole Swing the Side Support to rest against the side of the Leg Mark and drill a 1 4 diameter pilot hole into th...

Страница 15: ...STEP 18 Steps Slide the Ladder Steps C into the Slots in the Step Support and the Step Leg Make the bottom front edge of each Step even with the face of the Step Support and Step Leg Fasten the Steps...

Страница 16: ...ling Screws through the pre drilled holes from below Drill the Screws up through the steel pipe until the head of the screw is flush with the surface of the wood STEP 22 Stringers Fasten the Stringer...

Страница 17: ...using four 10 x 2 1 2 T25 Screws Use 1 8 diameter pilot holes to ensure the screws do not split the Rung Support and Leg Align the bottom edge of the Rope Board K with the bottom edge of the Rung Supp...

Страница 18: ...alling seven more Roof Boards sliding them under the previous Roof Board and fastening the Roof Boards using 8 x 1 5 8 Screws Leave off the final two Roof Boards for now Final Roof Boards Before attac...

Страница 19: ...her Fasten a Ceiling Joist AN to the outside of the Roof Rafters on each end Use two 5 16 x 3 Hex Bolt Assemblies Fasten the remaining Ceiling Joists to the other Roof Raf ters using two 5 16 x 3 Hex...

Страница 20: ...HE ROPE BE UNTIED OR LOOSE ENOUGH TO FORM A LOOP THIS PRESENTS EX TREME DANGER TO YOUR CHILDREN Figure 8 Knot STEP 30 Hand Grips Place one Hand Grip I flat against the outside face of the left back Po...

Страница 21: ...t when fully tightened Pull down on the cargo net to tighten the knots Fasten the bottom of the Cargo Net to the Rope Base Rail by passing the end of each rope through a hole and tying a knot At least...

Страница 22: ...re the holes in the Slide are over the Slide Mount Ensure the Slide extends out perpendicular from the Playset Drill 5 16 holes through the Slide Slide Mount and Deck Boards us ing the holes in the Sl...

Страница 23: ...Assembly NORTHBRIDGE WOOD ROOF 19950 100 Rev C 05 18 Copyright 2016 Creative Playthings Page 23 ASSEMBLY INSTRUCTIONS...

Отзывы: