9
STEP 3.
Running Direct Burial Cable from Basin to Control Panel
STEPS & TIPS:
• All Penetrations Through the Basin MUST Be Sealed Watertight
• Cord Grip Penetrations MUST be Made Using a Drill and Appropriate Tap.
• Inlet Not Yet Connected - Shown For Reference Only
• Allow Approximately 7 Feet of Cable Inside the Basin to Allow for Wiring
and Cover Removal
FIGURE 5B
FIGURE 5A
Содержание Barnes Simplex OGV Series
Страница 6: ...6 Location of Basin And Control Panel FIGURE 1 ...
Страница 23: ...23 Basin Package Exploded View FIGURE 23 ...