10
FIGURE 6
STEP 4.
Connecting “Pump Power Leads” - SGPC or SGPC w/CVP
(Direct Burial Cable to Control Panel)
STEPS & TIPS:
• Check for nicks or damage to wire prior to installation
• Ensure Wire is Secured into Terminal Strip by Pulling on Wire After Installed
• Place A Strip of Green Electrical Tape on the Ground Wire.
Содержание Barnes Simplex OGV Series
Страница 6: ...6 Location of Basin And Control Panel FIGURE 1 ...
Страница 23: ...23 Basin Package Exploded View FIGURE 23 ...