21
STEPS & TIPS:
• Conduit Must Be Sealed To Prevent Water Infiltration
( Fig. 19).
• Peal and Place Gasket on Clean/Dry Basin Rim
Surface Inside Bolt Circle.
• Before installing the cover make certain that all cords
are tied up and clear of pump and level control.
STEP 11.
Sealing of Control Panel Conduit and
Installation of Cover Gasket
FIGURE 19
START UP PRE-CHECKLIST
BEFORE STARTING UP YOUR UNIT, CHECK THE FOLLOWING ITEMS:
INSTALLATION QUESTIONS:
Was A Proper Bedding Material Used
Is Basin Installed Level (within A Half Of Bubble)
Was The Proper Amount And Type Of Ballast Used
Was Backfill And Compaction Done To ASTM-D2321 To Properly Support Piping
Is The Inlet Location Provide Clear Removal Of Pump And Have A 1/8” Per Foot Drop
Are All Penetrations Through The Basin Wall Sealed Water-tight
Are All Piping Connections Tight And Required Valves Installed Properly
Has A Minimum Of 32 Inches Of Water Been Put Into The Tank
Has The Vent Been Installed On The Cover, If Required (Polycover Have Vent Factory Installed)
Varify All Valves Are Open
ELECTRICAL QUESTIONS:
Is The Junction Box Dry (if Applicable)
Are All Of The Cord Grips Tight
Are All Wiring Connections Secured
Is The Junction Box Cover Tight
Are All Cords Secured And Clear Of The Pump
Is The Control Panel Securely Mounted
Is The Control Panel Dry
Is The Conduit Entering The Control Panel Sealed (J-Box Units ONLY)
Are All Wiring Connections Secured
Turn The Circuit Breaker In Control Panel To “Off” Position
Turn The Circuit Breaker In The Service Drop/HouseHold Breaker Panel To The “On” Position
FIGURE 20
Sealing of Conduit Entering Electrical Enclosure
Содержание Barnes Simplex OGV Series
Страница 6: ...6 Location of Basin And Control Panel FIGURE 1 ...
Страница 23: ...23 Basin Package Exploded View FIGURE 23 ...