17
FIGURE 13
STEP 8C.
Junction Box Wiring for SGPC w/CVP Pumps
with “UltraSWITCH or FloatTREE”
STEPS & TIPS:
• Identify Which of The Following Style Junction Boxes is Used in your Package and Wire Per
Illustrations Shown.
• Inspect Wires for nicks or Defects Before Installing into the Junction Box.
• Lubrication May Be Needed to Help Install Wires THrough the Grommets.
• Secure Wire Connections with Appropriate Size Wire Nut. Check That Connection is Secure by pulling
on Wires After Installed.
• Place a Strip of Green Electrical Tape on The Ground Wire.
Содержание Barnes Simplex OGV Series
Страница 6: ...6 Location of Basin And Control Panel FIGURE 1 ...
Страница 23: ...23 Basin Package Exploded View FIGURE 23 ...