![CPAC RapidHeat RH-N95 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/cpac/rapidheat-rh-n95/rapidheat-rh-n95_operation-manual_2674876039.webp)
39
APPENDIX II
INSTALLATION PROCEDURES AND CONSIDERATIONS FOR CABINET INSTALLS
It is RECOMMENDED that this equipment be countertop installed to obtain the
maximum amount of ventilation airflow. A ventilation fan is installed with a user-‐
cleanable filter, described elsewhere in this manual.
The RH-‐N95 has an internal ventilation fan at lower right (viewed from the front) of
its rear panel. This fan draws air from the outside, through a ventilation air duct and
is discharged through the vent at the upper right of the rear panel. The enclosure
ventilation airflow maintains a moderate working temperature of the RH-‐N95’s
internal blower motor, and helps cool the control panel circuit boards.
The other significant item on the Pro11 rear panel is a switch which controls main
power and provides an overcurrent protection circuit breaker for the RH-‐N95.
The main considerations for installation of the Rh-‐N95 are:
o
Access for inspection and cleaning of the ventilation air filter.
o
Access for operation of the main power switch.
o
Clearance for entry and exit of RH-‐N95 ventilation air.
If your installation presents a question, please contact us.
CABINET INSTALLATION OPTIONS AND PRECAUTIONS
If considering a cabinet installation, the following options are recommended.
Regardless of the option, always maintain 4” or greater clearance at the back of the
unit for proper airflow and cooling. The power cord must always be free to extend
forward when moving the sterilizer to access the air filter and power breaker.
Recommended clearance dimensions if installed in a cabinet with no pullout:
o
Top: 3” inches, for air motion.
o
Rear: 4+” inches, for ventilation & airflow into/out of the RH-‐N95 enclosure.
o
Left side: No clearance required for airflow. Consider space for the door arc.
o
Right side: 4” for air flow, access to filter and main power switch.
o
If ventilation is not sufficient, consider removing the shelf back panel and
cutting vent holes in right side panel of the alcove shelf
o
See Fig. 1