4. HOLD THE PIPE, remove pipe
clamp and slide well seal over
rigid PVC pipe and onto well
casing. Position assembly so
that twelve inches of rigid PVC
pipe protrude from well seal.
Alternately turn bolts on well seal
clockwise until rubber gaskets are
tight against well casing and rigid
PVC pipe.
5. Cement 1-1/4" PVC elbow onto
rigid PVC pipe protruding from
well seal. If desired, some length
may be cut off of rigid PVC pipe
before cementing elbow. Smooth
the inside of any rigid PVC pipe
that has been cut with a round
file or knife.
6. If you are using the CLTS5 or
CLTS10 pump, thread a 1-1/4"
male PVC adapter into the front
of it. Hand tighten, then turn
1/4 turn with crescent wrench.
Seal the threaded pipe joints with
PTFE pipe thread sealant tape or PTFE-based pipe
joint compound approved for use on PVC.
Priming Shallow Well Jet Pumps
Steps 7–12 are for CL520 and CL100 convertible pumps.
See kit instruction sheet.
7. Open ejector kit.
Replace the deep
well nozzle with the
appropriate shallow
well nozzle, and
tighten until snug.
Thread shorter
venturi tube into
ejector until snug. Place gasket over venturi tube
so that openings in gasket line up with openings in
ejector.
8. Slide bolts through the bolt
openings on either side of the
ejector, through the gasket and
bolt ejector to front of the pump.
Tighten bolts securely.
9. Thread a 1-1/4" male PVC
adapter into front of ejector.
Hand tighten, then turn 1/4 turn
with wrench. Seal the threaded
pipe joints with PTFE pipe thread
sealant tape or PTFE-based pipe
joint compound approved for use on PVC.
10. Cement
as many
sections
and
couplings
of PVC
pipe needed to connect the PVC elbow to the 1-1/4"
male PVC adapter in the front of the pump.
11. Apply 2-3 wraps of PTFE
tape to the male threads on
the discharge tee. Using pipe
wrench, thread 1" discharge
tee into top of pump. Remove
pressure gauge plug from top of
discharge tee. TO PRIME: Put a garden hose into top
of discharge tee and fill pipes and pump until water
overflows from top of discharge tee. This may take
several minutes.
12. Thread pressure gauge and plug
into discharge tee. Make sure all
connections are tightly sealed.
13. Complete all electrical connections as described in
Wiring Your Pump.
Sealing Pipe Joints
Use only PTFE pipe thread sealant tape or PTFE-
based pipe joint compound for making all threaded
connections to the pump itself. Do not use pipe joint
compounds on plastic pumps: they can react with the
plastic in pump components. Make sure that all pipe
joints in the suction pipe are air tight as well as water
tight. If the suction pipe can suck air, the pump will not
be able to pull water from the well.
14. Screw 1" male PVC
adapter into discharge
tee outlet.
15. Thread 10" x 1" nipple into
pressure tank. Thread tank
cross into nipple so that
the two 1/4" holes in tank
cross face upward. Plug two
outlets on tank cross with
two 1/4" plugs.
16. Thread 1/2" boiler drain into
front of tank cross. Thread 1"
male PVC adapter into inlet
side of tank cross. Connect to
household plumbing.
APPROX.
12" OF
PVC PIPE
PROTRUDING
FROM WELL
SEAL
WELL
SEAL
1-1/4"
PVC
ELBOW
TOP OF
PVC PIPE
PROTRUDING
FROM WELL
SEAL
1-1/4"
MALE PVC
ADAPTER
PUMP
BUSHING
EJECTOR
BOLT
1-1/4"
MALE PVC
ADAPTER
1-1/4" PVC PIPE
PRESSURE
GAUGE
PRESSURE
GAUGE
PLUG
DISCHARGE
TEE
1" MALE
PVC ADAPTER
1/2"
BOILER
DRAIN
1" MALE PVC
ADAPTER
TANK
CROSS
1/4" PLUGS
NIPPLE
6391 0211
Gasket
Venturi
tube
Nozzle
Ejector
Bolts
Installation 6