![Coulomb Technologies ChargePoint CT2025 Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/coulomb-technologies/chargepoint-ct2025/chargepoint-ct2025_installation-manual_2672974040.webp)
ChargePoint® Charging Stations
4-6
Step 5 - Secure head assembly and filler panel
Before securing the head assembly,
ensure that the top is flush with the
access panel’s bottom cutout, and that
no gap exists between the bottom of the
head assembly and the top of the filler
panel. You may also need to push down
on the cable assemblies to ensure they
are fully seated. All assemblies fit tightly
and may require extra downward force to
ensure they are fully seated.
Using a T25 Torx driver, secure the head
assembly to the body by tightening its two
captive security screws.
Tighten the two security screws on the
filler panel.
IMPORTANT!
Tighten screws only
until snug (approximately 15 in-lbs). Do
NOT overtighten.
Tighten the two security
screws on the head
assembly
Tighten the two security
screws on the filler panel
Ensure the head
assembly is flush with
the top of the access
panel’s cutout