background image

 

 



UT 

Handbook for Use and Maitenance – 50000 WB-80-87-95 

Edition

 01/11 

Revisione 

00 

46 

50000WB_e111_E.doc 

 

(Chapter 4) - EXTRAORDINARY MAINTENANCE

 

 
Se  la  gru  è  stata  usata  con  cura  e  sono  state  effettuate  le  manutenzioni  previste,  
essa  non  avrà  bisogno  di  particolare  manutenzione  straordinaria  per  molto  tempo; 
tuttavia  diamo  alcune  indicazioni  per  ovviare  anche  autonomamente  a  possibili 
disfunzioni.

 

 

INCONVENIENCES 

REMEDIES 

4.1 - THE CRANE DOES NOT 
WORK

 

 

a) The pump does not rotate 
 

Check the power take off coupling 

b) The 2 ways valve “crane/outriggers” 
is set on “outriggers” 
 

Activate  the  lever  of  the  two  ways 
valve. 

c) The tank tap has been closed 
 

Open  the  tap  The  pump  can  be 
domaged. 

d) The green light on the control block 
and  on  the  box  located  on  the  frame 
are not going to on 

Main fuse blown. Replace it. 
 
To check  the main switch 
 
 

 

 

f) The dump valve  does not close 

Press  the  emergency  button,  if  the 
solenoid is powered (red light in the 
connector on), replace it. If  it  is not 
powered,  check  the  system.  If  it 
does  not  work  in  spite  of  pressing 
the  button,  dismount  and  clean  the 
body of the valve or replace it. 
 

g)  An  emergency  stop  button  is 
activated 
 

Check  all  the  buttons  and  reset  the 
work position 

h) Boom lowering and boom extending 
functions  do  not  work  and  when 
activated the green light goes off.  
 

There  is  a  interruption  inside  the 
load  limiting  device  circuit:  verify 
connections 

and 

the 

pressure 

switches 

i)  The  crane  when    in  overload 
condition, 

stays 

locked, 

no 

one 

function is working. 
 

One  of  the  micro  switches  activated 
by  the  control  levers  is  broken  or  is 
locked, verify the switches. 

4.2 - THE CRANE MOVES BUT IT 
IS NOT POWERED

 

 

a) The 2 ways valve “crane/outriggers” 
hasn’t  been  pushed  to  the  end  of  its 
stroke. 
 

Push  the  lever  of  the  2  way  valves 
until it reaches end stroke position. 

b)  The  solenoid    valve  does  not  close 
sufficiently 
 

Proceed as in point 4.1.f 

Содержание 50000 WB 50000 WB80

Страница 1: ...00 1 50000WB_e111_E doc ENGLISH 50000 WB HANDBOOK FOR USE AND MAINTENANCE EDITION 1 2011 Models 50000 WB80 50000 WB87 50000 WB95 25018 MONTICHIARI BRESCIA ITALIA Via Madonnina n 27 C P 199 Tel 39 030...

Страница 2: ...imited to the front 180 The rotation towards the rear is prevented with mechanical means The load charts for the crane vehicle assembly apply only to the authorised working area When full stability is...

Страница 3: ...AFTER THE FIRST 20 HOURS OF OPERATION 37 3 2 AFTER THE FIRST 300 HOURS OF OPERATION 37 3 3 PERIODIC MAINTENANCE 37 3 3 1 EVERY 20 HOURS OF OPERATION 37 3 3 2 EVERY 100 HOURS OF OPERATION 39 3 3 3 EVER...

Страница 4: ...sn t build up other tensions on the structure the those of the hook itself Lifting capacities are calculated for a crane servicing the vehicle on which it is installed The use of the crane with the gi...

Страница 5: ...oil supplied by S r l contained in the hydraulic system and in the tank when the crane is mounted directly by the same is type For cold climates we recommend the use of lower viscosity oils mineral ty...

Страница 6: ...itting plate 6 Control station 31 Bottom fitting plate 7 Left outrigger beam 32 Fitting nut 8 Screws of bearing inner ring 33 Power take off 9 Screws of bearing outer ring 34 Shaft 10 Bearing 35 Pump...

Страница 7: ......

Страница 8: ......

Страница 9: ...doc 1 3 NOTIONS FOR THE FIRST INSTALLATION 1 3 1 ELECTRIC SUPPLY OF THE MACHINE The 2 plugs that must be used for the connection to the power supply are located in the lower part of the crane picture...

Страница 10: ...S they are the interfaces for the connection of a radio remote control optional 1 3 2 HYDRAULIC SUPPLY OF THE MACHINE The picture 5 shows the connection P for the connection to the pump outlet REMAIND...

Страница 11: ...ank Set the flow controller of the pump in such a way that the difference between the two pressure read at the two pressure gauges is equal to 17 bar 247 psi No one lever of any function shall be move...

Страница 12: ...UT Handbook for Use and Maitenance 50000 WB 80 87 95 Edition 01 11 Revisione 00 12 50000WB_e111_E doc Picture 6 1 4 Picture 7 2...

Страница 13: ...UT Handbook for Use and Maitenance 50000 WB 80 87 95 Edition 01 11 Revisione 00 13 50000WB_e111_E doc Picture 8 3...

Страница 14: ...ched to the crane fit the crane and have been verified for the use they are intended to be used DANGER OF INTOXICATION It is necessary to deviate the exhaust gases in case the operator s station is lo...

Страница 15: ...used whenever it is necessary to halt all of the movements of the crane instantly For example A control lever remains stuck and does not allow for the movement to stop The emergency button does not s...

Страница 16: ...be overloaded in order to check if the load limiting device works properly verify that the distance correspond to the right one indicated on lifting diagram make sure that the red lights are on and th...

Страница 17: ...s all the controls have been powered on A green light installed on the electric box picture 11 gives the indication to the operator that the crane has the correct electric supply This can be seen be v...

Страница 18: ...In the rest position extension of the stabiliser cross member supplied as standard is prevented by means of a pin which is removed by rotating the handle 180 Picture 12 After release activate the ext...

Страница 19: ...nt Right and left stabilisers must be moved alternatively in order to maintain the truck chassis as straight as possible Make sure the vehicle is levelled by using the level gauges located near by the...

Страница 20: ...ting in B The wheels of the vehicle must not be completely off the ground Whenever working off the road on soft ground or asphalt arrange distribution plates under the stabilisers supplied on request...

Страница 21: ...retracted turn the handle of the looking system by 180 degree and verify that the beam is properly secured Picture 12 Repeat this procedure for each stabiliser DANGER OF CIRCULATION WARNING IF ANY ONE...

Страница 22: ...oise only it can stand the weight of one person only 100 Kg It is expressly forbidden to have more than one person on the catwalk at any time Walking on the catwalk must be made with extreme care payi...

Страница 23: ...Main boom rising cylinder control lever 4 Rotation control lever 5 Main boom extension cylinder control foot pedal 6 Knuckle boom extension cylinder control foot pedal 7 Fork opening and closing func...

Страница 24: ...he radio remote controls supplied on demand 5 Green light which is on when the controls from the radio remote controls have been activated 6 Start button which if connected can be used to start the tr...

Страница 25: ...oad no one is standing within the boom range of action the area where the load is to be deposited is clear the main boom is over the horizontal line IT IS FORBIDDEN to lift object when the main boom i...

Страница 26: ...alled behind the driver s cab use particular care because the load carrying capacity on the front is usually greatly reduced which means that the vehicle is very likely to overturn Picture 12 DANGER O...

Страница 27: ...slope of maximum 5 with the boom full retracted and the boom angle 45 For working with the boom extended or at high boom angle the base of the crane must be put in horizontal level During descent with...

Страница 28: ...this working way may end up in serious damage to the crane structure and create dangerous situations for the operator Picture 24 The extension and retraction capacity of the outer boom retraction cyl...

Страница 29: ...or anything else which may cause similar action on the crane is not permitted The slinging and the holding devices are always included in the useful load capacity Before the load is lifted make sure...

Страница 30: ...only instrument to establish the capacity of the crane b The device installed stops the machine when there is an overload However the values shown in the load capacity chart must always be observed c...

Страница 31: ...he system in order to overload the crane As an example we can mention the pressure available inside the main lifting cylinder is higher than the pressure at which the load limiting device is set for t...

Страница 32: ...elation to the horizontal line 20 means that the function is forbidden only when the angle is bigger than 20 Function First boom load limiting device Second boom load limiting device Inner 1st boom ri...

Страница 33: ...on of the electric valve shown in the picture and operate in such a way that bring the crane back into safety conditions During emergency operation keep an eye on the load indicator so that the crane...

Страница 34: ...escriptions and illustrations are given as information and are not binding they are subject to change without notice 50000 WB80 02 D 783 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 ft m 95 90 85 80 75 70...

Страница 35: ...trations are given as information and are not binding they are subject to change without notice 50000 WB87 02 D 821 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 ft m 100 95 90 85 80 75 70 65 60 55 50 45...

Страница 36: ...formation and are not binding they are subject to change without notice 50000 WB95 02 D 813 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 ft m 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25...

Страница 37: ...to the chassis using a torque wrench torque 67 daN m lubricated 72 9 daN m not lubricated Check the torque of the bolts securing the thrust bearing to the crane base and eventually tighten with a tor...

Страница 38: ......

Страница 39: ...attention to the moving parts Through the grease nipples Zerks on the side grease the stabilisers and also the pin of the 3 points linkage 3 3 3 EVERY 200 HOURS OF OPERATION Lubricate all the articul...

Страница 40: ...is before 2000 hours of operation IF THE OIL IS NOT CHANGED AT THE SET INTERVALS THIS MAY CAUSE DAMAGE TO THE SYSTEM AND SERIOUSLY AFFECT OPERATION OF THE SAFETY VALVES N B The type of oil used is mar...

Страница 41: ...YLINDER RELEASE THE PRESSURE BY COMPLETELY SLACKENING THE REGISTERS CAREFUL REGULAR MAINTENANCE WILL EXTEND THE LIFE OF THE CRANE AND MAKE IT SAFER 3 5 MAINTENANCE TO BE CARRIED OUT AFTER A LONG PERIO...

Страница 42: ...tes and in workshops authorised by Cormach S r l Here follows a table memorandum in which for every due date the operations necessary on the crane are reminded The workshop that materially carried out...

Страница 43: ...urs of functioning Points where the perations to be xecuted are described Date of execution Stamp and sign of authorised workshop Notes 4800 3 3 4 5000 3 3 5 5400 3 3 4 6000 3 3 4 3 3 5 3 3 6 6600 3 3...

Страница 44: ...AINS INSPECTIONS The wire ropes and chains used on the crane must be verified and results must be recorded inside the following table For the timing of each inspection refer to local prescriptions For...

Страница 45: ...3 8 NOTES FOR EXCEPTIONAL PARTS EXCHANGES Repairs or exchanges of structural components electric or hydraulic components related with the crane safety must be recorded in this section N of repair Dat...

Страница 46: ...he dump valve does not close Press the emergency button if the solenoid is powered red light in the connector on replace it If it is not powered check the system If it does not work in spite of pressi...

Страница 47: ...d by repeatedly operating movements fully to end of stroke 4 5 THE EXTENSION CYLINDERS VIBRATE WHEN MOVING OUTWARDS OR INWARDS AND ARE OUT OF SEQUENCE a Were pads not lubricated Lubricate sufficiently...

Страница 48: ...UT Handbook for Use and Maitenance 50000 WB 80 87 95 Edition 01 11 Revisione 00 48 50000WB_e111_E doc APPENDIX A ADDITIONAL RISKS...

Страница 49: ...UT Handbook for Use and Maitenance 50000 WB 80 87 95 Edition 01 11 Revisione 00 49 50000WB_e111_E doc SPECIAL NOTES SPECIAL VERSION...

Отзывы: