31
Water supply
The water supply pipe is to be connected via the
filter valve
(accessory “Z261”), to the connection on the
unit (see foregoing illustration). The filter valve should be installed as close to the humidifier as possible.
Note: Instead of the filter valve, a
shut-off valve
and a
water filter 5 µm
(
(both essential) can be used.
The following specifications must be observed:
– Connections on unit:
BSP 1/2"
(outside thread)
– Min. inner diameter of supply line:
12 mm
– Admissible mains pressure
3.0 to 8.0 bar
(hammerfree system)
For mains pressures >8 bar, connection must be made via pressure reducing valve (adjusted to
3.0 bar). For mains pressures <3.0 bar please contact your Condair supplier.
– Supply rate:
10 l/min
– Admissible supply temperature:
1…30 °C
–
Notes on water quality
:
– For the water supply of the Condair GS...OC, use exclusively
untreated drinking water
or
fully
demineralized water
.
Note
: The use of fully demineralized water reduces the maintenance and the cleaning of the
water tank to a minimum.
– The use of
additives
such as corrosion inhibitors, disinfectants, etc. is
not allowed
, since these
additives may endanger health and affect proper operation.
– If the Condair GS...OC shall be operated with softened or partly softened water, please contact
your Condair supplier.
– The connection material must be
pressure-proof
and
certified for use in the drinking water supply
.
Caution!
Fully demineralized water is aggressive. When making connections to a fully dem
ineralized water system, use
exclusively plastic or stainless steel installation materials
(min. DIN 1.4301).
–
Important!
Before connecting the water line to the unit, the line must be flushed thoroughly.
Содержание GS 120 OC
Страница 2: ......
Страница 69: ...69 Notes...
Страница 70: ...Notes...
Страница 71: ...Condair Ltd Printed in Switzerland Technical modifications reserved...