43
– Water drain and auxiliary water drain
Has minimum inside diameter of drain pipe (at least 45 mm) been maintained throughout the
entire length?
Have drain pipes been installed with a downslope of at least 10 %?
Have temperatureresistant materials been used (up to 100°C)?
Are the hoses and pipes correctly attached and sealed (hose clamps and screwed connec
tions tightened)?
Is the minimum funnel height of 150 mm observed?
– Gas installation
Is the shutoff valve fitted?
Is a sediment separator installed, if steel pipes are used?
Is the gas circuit correctly sealed (leakage check carried out)?
Is the permissible gas pressure being maintained (see the table in 5.5.1)?
Have the correct sealing materials been used?
–
Flue gas system
Is the supplied flue gas pipe with storm collar and rain cap used?
Are all connections of the flue gas pipe properly sealed and secured?
Does the flue gas system comply with the local regulations?
Is the flue gas outlet at least 60 cm above any ridge within 3 m of the unit?
–
Electrical installation
Does the electrical installation comply with the local regulations?
Do the mains voltages applied correspond to the supply voltage stated on the rating plate of the
unit?
Is the voltage supply correctly fused?
Is the service switch “Q” installed in the supply cable and located in the compartment outside the
unit, above the electrical service door?
Are all components correctly connected in accordance with the wiring diagram?
Are all connection cables fixed?
Are the connecting cables free of tension (fitted through cable glands/secured with cable clamps?)
Is the Condair GS...OC correctly configured?
Содержание GS 120 OC
Страница 2: ......
Страница 69: ...69 Notes...
Страница 70: ...Notes...
Страница 71: ...Condair Ltd Printed in Switzerland Technical modifications reserved...