G-2
I
Appendix
Mold Purge Installation Instruction Sheet
(continued)
TW-V
5
Attach the flexible metallic conduit to 1/2” NPT elbows (quantity 2) to the solenoid valves.
6
Attach the 1/2” pulling elbow to the back of the mechanical enclosure with the male end going through the hole labeled in Detail
A, and the female end pointing straight up. Attach the duplex connector, to the female end of this elbow.
7
Cut the flex metallic conduit into two pieces long enough to carry the wires of each solenoid valve to the duplex connector on the
back of the mechanical enclosure.
8
Using anti-short bushings on each end of the conduit pieces, run the wires of the solenoid valves through the separate pieces of flex
conduit, the duplex connector and elbow, the mechanical enclosure, the hole towards the bottom of the electrical enclosure back
panel labeled in Detail B and into the electrical enclosure.
9
Secure the ends of the flexible conduit pieces in the elbows on the solenoid valves and the duplex connector.
10
Wire the electrical components according to the mold purge option in the control schematic shown below.
11
Skip to step 20.
Value Control Electrical Schematic
(continued)
Содержание Thermolator TW-P
Страница 6: ...iv I Table of Contents ...
Страница 12: ...1 6 I Introduction ...
Страница 36: ...3 14 I ...
Страница 58: ...4 22 I Operation ...
Страница 72: ...5 14 I Maintenance ...
Страница 128: ...E 4 I Appendix ...
Страница 134: ...G 4 I Appendix ...
Страница 136: ...H 2 I Appendix ...