5 . 4 E l e c t r i c a l c o n n e c t i o n
To install the granulator the granulator hopper must be opened. The hopper cannot
be operated until the granulator is electrically connected.
Connect the granulator to the main power supply. The rated connecting voltage
(Volt) and size of fuse (Am) for the machine is stated in the electrical circuit dia-
gram.
The granulator is connected for a right-hand rotating field on delivery.
Check the phase sequence of the power supply using a phase-sequence indicator
and connect the granulator with a connector to the mains power supply.
Location of the electrical cabinet
The electrical cabinet, with main switch, start panel and emergency stop, must be
positioned so that the emergency stop on the start
panel is always within reach of the operator during
operation and feeding of granulation gods.
If the operator cannot reach the emergency stop
knob on the start panel, during operation of the
granulator. The granulator must be fitted with at
least one additional emergency stop by the respon-
sible electrician as part of the initial installation.
At least one emergency stop knob shall always be
within reach of the operator in the working range
of the granulator, including optional equipment for
the granulator such as belt conveyor, shredder, dust
filter, etc.
Check the direction of rotation of the granulator motor:
Ensure that the granulator stands horizontally and steady.
IMPORTANT!
Check so that all
machine shoes take up load.
• Undo and remove the side plate
on left side of the granulator.
• Noise encapsulated machine
open the doors.
• Ensure that the cutter house door
and the hopper are properly
closed.
• Noise encapsulated machine
close the doors.
NOTE:
The granulator
may only be connected to
the main supply by an
authorized electrician.
NOTE:
At least one
emergency stop shall
always be within
reach of the operator.
5 - 6
l M a i n t e n a n c e