24 - Hardware Installation
DeviceMaster Installation and Configuration Guide
: 2000594 Rev. F
Hardware Installation
4.
Verify that the
PWR
LED has completed the boot cycle and the network connection for the DeviceMaster
is functioning properly.
Do not connect RS-422/485 devices until the IP address is configured and an appropriate
port interface type has been configured. The default port setting is RS-232.
5.
on Page 33 to configure the DeviceMaster for use.
4-Port and 8-Port LED Descriptions
PWR
LED on the front panel of the DeviceMaster is lit, indicating you have power and it has
completed the boot cycle.
Note:
The
PWR
LED flashes while booting and it takes approximately 15 seconds for the
Bootloader to complete the cycle.
When the Bootloader completes the cycle, the LED
has a solid, steady light that blinks approximately every 10 seconds
.
LNK
ACT
The red
LNK ACT
LED is lit, indicating that you have
a working Ethernet connection.
COL
If the red
COL LED
is lit, there is a network collision.
100
If the red
100
LED is lit, it indicates a working 100 MB
Ethernet connection (100 MB network, only). If the
LED is not lit, it indicates a 10 MB Ethernet
connection.
Note:
For additional LED information, go to the
on Page 148.
LNK
ACT
COL
100
10/100 NETWORK
UP
DOWN
Caution
Содержание DeviceMaster PRO
Страница 1: ...Installation and Configuration Guide ...
Страница 32: ...32 Hardware Installation DeviceMaster Installation and Configuration Guide 2000594 Rev F Hardware Installation ...
Страница 130: ...130 Managing the DeviceMaster DeviceMaster Installation and Configuration Guide 2000594 Rev F Managing the DeviceMaster ...