16 - Hardware Installation
DeviceMaster Installation and Configuration Guide
: 2000594 Rev. F
Hardware Installation
DM-2201: 1-Port DIN Rail (Terminal Block) Installation
Use the following procedure to install DM-2201. See
DM-2101: 1-Port DIN Rail (DB9) Installation
if the DeviceMaster has DB9 serial connectors.
1.
Attach the DM-2201 1-Port to the DIN rail adapter.
2.
Connect the power supply and apply power to the DM-2201 using the power supply specifications on the
product label and the following information.
Observe proper ESD techniques when connecting and disconnecting the DeviceMaster.
a.
If the DIN rail is not connected to earth ground, insert the earth ground wire into the chassis ground
screw terminal.
Note:
The chassis ground connection is made only if the
DIN rail is NOT connected to earth ground.
b.
Insert the DC positive wire into the + screw terminal
and the DC return wire into the - screw terminal.
DM-2101 and DM-2201: 1-Port DIN Rail
on Page 140 for detailed power
requirements.
c.
Use a small flat head screw driver to lock the wires
into place.
d.
Verify that each wire has been tightened securely.
e.
Connect a UL Listed power supply and UL Listed
power cord to a power source to apply power.
Note:
Do not connect multiple units until you have changed
the default IP address, see
3.
Connect the
10/100 port
to the same Ethernet network segment as the host PC using a standard network
cable.
4.
Verify that the
Status
LED has completed the boot cycle and network connection for the DM-2201 is
functioning using the following table.
Do not connect RS-422/485 devices until the IP address is configured and an appropriate
port interface type has been configured. The default port setting is RS-232.
DM-2201 LED Descriptions
STATUS
The
STATUS
LED on the device is lit, indicating you have power and it has
completed the boot cycle.
Note:
The
Status
LED flashes while booting and it takes approximately 15
seconds for the Bootloader to complete the cycle.
When the Bootloader
completes the cycle, the LED has a solid, steady light that blinks
approximately every 10 seconds
.
LINK
If the
LINK
(green) LED is lit, it indicates a working Ethernet connection.
ACT
If the
ACT
(yellow) LED flashes, it indicates network activity.
Note:
For additional LED information, go to the
Caution
† Wire gauge: AWG 12-22
PW1
PW2
Chassis
Ground†
Return†
Positive†
Positive†
5-30VDC
5-30VDC
Caution
Содержание DeviceMaster PRO
Страница 1: ...Installation and Configuration Guide ...
Страница 32: ...32 Hardware Installation DeviceMaster Installation and Configuration Guide 2000594 Rev F Hardware Installation ...
Страница 130: ...130 Managing the DeviceMaster DeviceMaster Installation and Configuration Guide 2000594 Rev F Managing the DeviceMaster ...