PCB-4000A 1+1 Phase Combiner
Revision 2
Operation and Adjustment Procedures
3–5
MN-PCB-4000A
Step
Procedure
5
Install the “COM” Cable (CEFD P/N CA/WR11966-2) between each of the following PCCB connectors and their
corresponding SSPA “COM” ports:
•
(PCCB) “SSPA COM 1 | J2” to SSPA #1
•
(PCCB) “SSPA COM 2 | J3” to SSPA #2
6
Install a WG Switch Control “Y” Cable (CEFD P/N CA/WR12013-1) between the PCCB connector labeled
“SSPA SW OUT | J5” and the two WG switches as shown in Figure 3-1. Pay particular attention to ensure that
the ends labeled “SW1” and “SW2” are connected, respectively, to WG Switch #1 and #2.
7
Install the user-provided RF Input Switch control cable (if applicable) to the PCCB “RF INPUT SWITCH | J6”.
8
Properly terminate the WG system output port, review all cables for proper connections, and ensure that all
mounting hardware is tightened.
Содержание PCB-4000A
Страница 28: ...PCB 4000A 1 1 Phase Combiner Revision 2 External Connectors 2 8 MN PCB 4000A Notes...
Страница 70: ...PCB 4000A 1 1 Phase Combiner Revision 2 Assembly Kits A 4 MN PCB 4000A BLANK PAGE...
Страница 87: ......
Страница 88: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX...