2-1
Chapter 2. Installation
2.1 Unpacking
Perform a receiving inspection as follows:
•
Inspect the shipping container for damage. The shipping container and packing
materials should be retained for possible reshipment.
•
Check to determine that all parts, materials and documentation have been shipped
with the KPA. The KPA should be inspected for possible damage, and then tested for
proper operation.
•
If the shipment exhibits any of the following, contact Comtech EF Data Customer
Support:
♦
Incomplete
♦
Mechanical damage
♦
Inoperable
If there is damage to the shipping container, notify the carrier. Retain all shipping
materials for inspection by the carrier.
Содержание KPA-020IN
Страница 2: ......
Страница 13: ...Ku Band Solid State Power Amplifier Revision 0 Preface MN KPA IOM xi NOTES...
Страница 17: ...Ku Band Solid State Power Amplifier Revision 0 Introduction MN KPA IOM 1 4 Figure 1 3 Block Diagram of KPA 040...
Страница 23: ...Ku Band Solid State Power Amplifier Revision 0 Installation MN KPA IOM 2 4 Figure 2 1 Redundancy Installation 1...
Страница 31: ...Ku Band Solid State Power Amplifier Revision 0 Installation MN KPA IOM 3 6 NOTES...
Страница 33: ...Ku Band Solid State Power Amplifier Revision 0 Installation MN KPA IOM 3 8 NOTES...
Страница 59: ...Ku Band Solid State Power Amplifier Revision 0 Redundant Configuration MN KPA IOM 5 6 NOTES...
Страница 87: ...Ku Band Solid State Power Amplifier Revision 0 Maintenance and Troubleshooting MN KPA IOM 7 6 NOTES...
Страница 99: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX...