2-24
Compaq ProLiant 6400R Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer:
Gilbert Saldivar
Project:
Compaq ProLiant 6400R Setup and Installation Guide
Comments:
Part Number:
388776-002
File Name:
c-ch02 Rack-Mountable Server Installation
Last Saved On:
3/17/00 1:41 PM
WARNING:
Do not place anything on power cords or cables. Arrange them so
that no one may accidentally step on or trip over them. Do not pull on a cord or
cable. Grasp the cord by the plug when unplugging from the electrical outlet.
WARNING:
To reduce the risk of electrical shock or fire, do not plug
telecommunications/telephone connectors into the Network Interface Card (NIC)
receptacles.
2.
If you install a switch box in the rack, route the CPU-to-switch-box
cables to the switch box.
3.
Bundle all the cables, including the power cables, and tie them to the
cable management arm.
Figure 2-16. Routing and securing the cables
4.
Extend the bundled cables down the rack cable channel.
Powering Up the Server
You can now bring your ProLiant 6400R server online according to your
network and operating system procedures.
Press the Power On/Standby switch to on.
When the system is first powered on, the system ROM detects the
unconfigured state of the hardware and provides default configuration settings
for most devices. With the initialization, the system can run Diagnostics and
other software applications before running the normal SmartStart and System
Configuration programs.
Содержание 6400R - ProLiant - 1 GB RAM
Страница 8: ......
Страница 115: ...Regulatory Compliance Notices A 5 Japanese Notice Taiwanese Notice...