Page | 31
VERVE LED
Step 9:
Insert one end of the power cable on the top of the Print Head and gently press it to fix, as shown
in the image below:
Fig 36: Fixing the Power Cable
Step 10:
Similarly, insert the second end of the power cable on the Power Supply Board and gently lock
the cable with the Power Supply Board.
Step 11:
Perform the
Head Purging
for all colors. First, Switch OFF the Negative Pressure knobs of all color.
After that, Switch ON the Negative Pressure knob of the selected color and press the Cleaning button.
Similarly, perform this action for each color.
Step 12:
Perform the
Head Blotting
to gently clean the Print Head.
Step 13:
Perform the
Nozzle Test
to check the nozzle status of all the Print Heads.
Now, the Print Head gets installed.
Содержание VerveLED VLY 2513
Страница 1: ......
Страница 46: ...Page 45 VERVE LED The Right Calibration Result is shown in the image below Fig 57 The Horizontal Right Check ...
Страница 55: ......