Page
12
of
50
SOFTJET GRAND
Step 8:
Level the machine using the inside and outside levelers. The
Machine Levelers
are shown as
follow:
Fig 4: Displaying the Machine Levelers
Step 9:
Switch on the printer and wait for the complete initialization of it.
Step 10:
Check and verify the settings of attached parts of the printer viz. Heater, Take Up, Supply,
etc.
Step 11:
Install the Printer Manager software and RIP software for printing. Please refer to the
Installing the Printer Manager section for more details.
Step 12:
Issue a dry print command to check whether the printer works well.
Step 13:
Fill ink in the main tank and sub tank. Please refer to the
“Ink Filling”
section to fill ink.
Step 14:
Install the Print Head, please refer to the Head Installation section to install the Print Head.
Step 15:
For test printing, perform the Nozzle Test and verify the result.
Now, the printer gets ready for use.
Leveler