background image

AN 06/2003

Technical Specifications:

Processing applications:

RA Photopaper for digital applications incl. Duratrans

Paper width:

max. 80 cm (31 inch)

Microprocessor Control:

- with 9 preprogrammable  processing cycles

Transport Speed (at 45 sec DEV-Time):

- 70 cm/min  (42 inch/min)
- 95 cm/min  (42 inch/min)
- 120 cm/min  (42 inch/min)
(preprogrammable 20 to 116 sec.)

    

Tankcapacity

Temperature*

Repl. Rate*

Developer

:

x lt

18 - 43°C

40-2000ml/m²

Bleachfix

:

x lt

18 - 43°C

40-2000ml/m²

Superstabi1

:

x lt

18 - 43°C

40-2000ml/m²

Superstabi2

:

x lt

18 - 43°C

40-2000ml/m²

Superstabi3

:

x lt

18 - 43°C

40-2000ml/m²

Replenishment:

- controlled by up to 10-sensors, measuring media area
- activated after 0,1 - 0,999m² 

*

material fed into the processor

- antioxidation/standby replenishment, activated after 0-9 hours 

*

Anticrystalisation/
Selfcleaning Cycle
during Standby:

- activated   : each 1 - 20 min

 *

- cycle time : duration 1 - 3 min 

*

Filter Replacement Programming:

0 - 9999 m² 

*

.........* all values preprogrammable

Control: -  Activate and Monitoring features inform, warn and alert the operator to an error in the system.

Solution Levels:

-Low Level monitoring in Dev-, Bleachfix, and all Superstabi- Tanks
of processor **
-High Level monitoring in Overflow Collection Tanks (waste management) **
-Low Level in Repl. Tanks for Dev-, Bleachfix and Superstabi **

Temperatures:

High / Low level monitoring of the Dev, Bleachfix, Superstabi and Dryer

Work in Progress  :

Details the position of the media through the processor.

Transport:

- drive motor overload monitoring  

**

-

 

security cover lid switch 

**

- manual feed facility

** when activated will operate an audible warning and a message alert to confirm the error type.

Additional Accessories and Features:

- Chiller unit (optional)
- A drawer unit within the main frame to house the replenishment and waste collection tanks.

Technical specification subject to change without notice.

  

  

 PrintlineProcessor

56/66/80 RA 70/95/120 - 5T

Содержание PrintlineProcessor 56 RA

Страница 1: ...Instruction Manual MP700 V5 2r04 05 06 06 2003 AN for COLENTA PrintlineProcessor 56 66 80 RA...

Страница 2: ...d each 1 20 min cycle time duration 1 3 min FilterReplacementProgramming 0 9999 m all values preprogrammable Control Activate and Monitoring features inform warn and alert the operator to an error in...

Страница 3: ...AN 06 2003 DIMENSIONS RA xx 5T SST Y for RA 56 860 mm Y for RA 66 960 mm Y for RA 80 1100 mm COLENTA 56 66 80 RA xx 5T...

Страница 4: ...TIONS 11 5 INFRARED SENSORBAR 12 6 REPLENISHMENTSYSTEM 13 14 7 HEATING COOLING CIRCULATION 15 17 8 TEST RUN AND TANK FILL 18 9 WORKING WITH THE CHEMISTRY 18 10 WORKING WITH THE PROCESSOR 19 11 CONTROL...

Страница 5: ...st technical standards Some outstanding design features include compact space saving design full automatic processing cycle smooth roller transport system low tank volumes electronically controlled te...

Страница 6: ...operation of the machine may be carried out by qualified and trained service personnel only Built in safety devices may not be eluded or made inoperative Use only original COLENTA spareparts whenexch...

Страница 7: ...as most of the regular cleaning agents However there is always a residual risk When handling chemicals observe the procedures below 1 Never sniff a container or open bottle to determine its contents A...

Страница 8: ...tographic processing and working The filmprocessor isa complex machine with moving parts such as the gear train and media transfer components It uses photo processing chemicals which are irritating to...

Страница 9: ...ls or guards when dryer in operation CorrosiveLiquids CHEMICALSMAYIRRITATEEYES LUNGS SKINANDDIGESTIVETRACT Wear safety goggles protective glovesand chemical aprons as indicated on Material Safety Data...

Страница 10: ...gles and rubber gloves If processor chemicals make contact with the eyes rinse them thoroughly with lots of water If irritation persists consult a physician 3 Dispose cleaning materialsand collected w...

Страница 11: ...d the processor 2 2 ELECTRICALSUPPLY Allelectricalconnections must meetnationalsafety requirements Correctfuses and electricalrequirementcan be takenfromthe processorspecification data sheet multi ter...

Страница 12: ...e optimum performance use a good quality leveling device Processor To carry the processor to the working area take care to the points below take out the racks and the dryer during carry the processor...

Страница 13: ...ler unit has to be installed Follow the illustrations below to do that Take care that all transport fixings are removed Removeallpacking materials Insert the racks according the reference number or la...

Страница 14: ...STALLATION OF THE DRYER Follow the illustrations below to install the dryer 10 1 Open the dryerlid 2 Put the dryer in and close the dryerlid 3 Check the position of the drive gear 1 Drive gear Chain 2...

Страница 15: ...ers ANTI OXIDATION During STANDBY mode and no material is processed during set time CYCLE anpreprogrammable ANTIOXIDATIONcycle replenishmentcycle is available Theadditionalreplenishmentcompensates the...

Страница 16: ...y dryer on Timed sequences are set to operate to pre programmed automatic requirements and are also used for providing a visual reference on the material location as it passes through the processor Im...

Страница 17: ...sors accurately monitor the width of material entering the processor this information is then used by the microprocessor CPU control software to calculate the surface area for each sheet loaded into t...

Страница 18: ...processor will bring the message WasteX high level This indication informs the operator that the waste container must be emptied or replaced with a fresh empty tank Levelsensor Highlevel DEV BF SS Lev...

Страница 19: ...olled to the precise pre programmed specifications Each solution is heated by a dedicated heat exchange flow heater unit located in the circulation lines which provides an efficient heating system wit...

Страница 20: ...t Superstabi 2 External thermostat Superstabi 1 Superstabi 16 To adjust the temp for the SuberStabi1 2 and3 use the external thermostats pointed below 7 1 HOW TO DRAIN THE PROCESSOR To drain the tanks...

Страница 21: ...l solution tank temperatures Thesetemperatureprobesarecontinuouslysupplyinginformationtothemicroprocessor onactual solutiontemperatureswithinthetanks Themicroprocessorthencomparesthese actual temperat...

Страница 22: ...ment tanks with water as well see page 22 how to start a replenishment cycle by hand Start Repl1 and Repl2 see page page 10 All replenishment pumps have to run now When the processor is turned on Elec...

Страница 23: ...chine reaches its Ready state it is recommended to load and read a process control test strip before running calibration or production prints normal working Program P1 READY Operate the machine for th...

Страница 24: ...perator to monitor the processor and to select special function Manual function mode technician to set or to change the processing parameters 1 back light ON OFF 2 check errors alarm shutdown 3 setup...

Страница 25: ...cessor will start in program1 P1 version of program P1 indicates that programme1 is in use and will operate to the programed values set in programme1 Everytime whenswitching onthe processorwill startu...

Страница 26: ...anks according page 17 to remove the above error codes 3 Rep1 low level DEV Rep2 low level BF Rep3 low level SS Fill thereplenishmentcontainers 4 Tank1 too cold DEV programed 35 Tank2 too cold BF prog...

Страница 27: ...am P1 wil change to P2 P3 until P8 and at least PSL Sleepmode There are 8 working programs and 1 Sleep program With 6 move the cursor to Use and confirm that with 7 Use 4 to jump back to the main page...

Страница 28: ...erator onallfunctionsandworkingparameters To do that use 8 to scroll trough the pages with 4 you can jump back to the main page 5 screens are available 24 P1 tells you that you are usingprograme1 In c...

Страница 29: ...use 4 to jump back to the main page xy Done is the progress indicator It means xy of the developing process is complete When it reached 100 the unit will stop the processing mode and will go to stand...

Страница 30: ...s started manually the displaywill indicate this on the main page by showing M1 instead of P1 11 7 SWITCHING ON OFFTHE DISPLAYILLUMINATION In a dark room it might be necessary to switch off the displa...

Страница 31: ...ver switch T1 no probe Temperature probe in Tank1 is defect or missing call service T2 no probe Temperature probe in Tank2 is defect or missing call service T3 no probe Temperature probe in dryer is d...

Страница 32: ...e courser under Options and confirm with 7 you will get use again 6 to move the cursor to Filter confirmwith 7 you will see The Area menu sets the amount of square meters before filter alert The value...

Страница 33: ...t ofthe rollersand thewash offpumponregularintervalstoprevent crystallizationontherollers Anti crystallization The anti oxidation cycle activats at preprogrammable time intervalstostartareplenishmentc...

Страница 34: ...re Start P1 Use Rep Monitor 30 11 14 MONITOR MENUE Motor Off On Motor is On or Off Speed 42 024 19 speed 001 pulse confirming from the motor tacho Normal s bar Type of sensorbar Area 0 0000 sqm Displa...

Страница 35: ...2 1 or 0 Valve 2 Cooling On or OFF as described before Rep1 0 Rep2 0 Rep3 0 Rep1 1 or 0 Replenisher pump 1 On or OFF Rep2 1 or 0 Replenisher pump 2 On or OFF Rep3 1 or 0 Replenisher pump 3 On or OFF O...

Страница 36: ...maintenance Regularmaintenance minimizes the chances forequipment failure and loss of processing quality A well trained person has to be responsible for performing the maintenance of the processor an...

Страница 37: ...mprocessor the racks have to be in Let the processor run for 10 to 15 minutes Switch off 0 position the main power switch of the filmprocessor and drain the processor tanks again NOTE Use cleaning sol...

Страница 38: ...during mixing the chemistry Always wear glasses or safety goggles to protect your eyes against the splashing of chemicals Always wear glasses and gloves when handling chemicals or while working in th...

Страница 39: ...water in order to avoid trays from overflowing Do not drain chemicals into public sewage systems without checking local regulations Never blend chemicals in one tank unless stated otherwise Always fo...

Страница 40: ......

Отзывы: