![Coherent Solutions SwitchBlade Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/coherent-solutions/switchblade/switchblade_user-manual_2634924017.webp)
Modular Optical Switch
|
SwitchBlade
Coherent Solutions
|
SwitchBlade
(V1.4)
13
Package the SwitchBlade for storage
7.
Once removed, put the SwitchBlade module
into the antistatic packaging for storage. This
will ensure the SwitchBlade is not subject to
ESD.
Figure 18 - Store the SwitchBlade Module
8.
Slide the
blanking module
into the empty slot
using the guide rails.
Figure 19 - Install the Blanking Module
9.
Once the
blanking module
is fully inserted,
fasten the captive screws on the top and
bottom of the
blanking module
to secure it into
place.
Figure 20 - Fasten screw under Release Latch
Power on the MTP1000
10.
Power on the MTP1000 by pressing the
Power
On/Off
switch. The switch will become
illuminated to verify that the instrument is
powered on.
Figure 21 - Power on the MTP1000
I
MPORTANT
After powering on the MTP1000, please wait at least 2 minutes before
attempting to communicate with the instrument. This will allow the MTP1000
enough time to finish boot procedures and initialize the communication server.
Содержание SwitchBlade
Страница 1: ......
Страница 40: ...V1 4...